Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T04BU02164
Parcel: 137070470

Review Status: Completed

Review Details: RESUBMITTAL - GRADING ALL

Permit Number - T04BU02164
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/12/2004 DAN CASTRO ZONING REVIEW Denied October 2, 2004

Development Services Department
Zoning Review Section
Dan Castro
Senior Planner

Comments:
1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering Review Section and until all zoning comments or concerns have been addressed.

2. Two copies of the approved and stamped development/site plan, landscape and NPPO plans must be included with grading plan
11/29/2004 DOUG WILLIAMS ENGINEERING REVIEW Denied SUBJECT: Site Review - New Senior Center
REVIEWER: Doug Williams
DATE: 29 November 2004
ACTIVITY NUMBERS: T04CM03923/T04BU02164
Engineering Division has reviewed the revised site and grading plans received 10 November 2004. Engineering Division approval is not recommended at this time. Please address the comments provided below. An over-the-counter review may be coordinated with me upon completion/provision of all items listed below:

1. Previous comment # 5 has not been fully addressed at this time. Please submit revised site and grading plan sheets demonstrating conveyance of roof drainage under all sidewalk areas, in accordance with Development Standard (DS) 2-08.4.1 E & 3-01.4.4 F.
2. Proposed grades should demonstrate water-harvesting maximization onsite to the maximum extent reasonably possible. Provide additional proposed grades, note(s) and details as necessary demonstrating conveyance of roof, parking area, and site drainage into landscape/water harvesting areas on applicable civil drawings. Assure any curb opening notes, drainage swales, and other similar conveyance mechanisms include pertinent elevations demonstrating such.
3. Depict a minimum curb return radius of 25' at the east campus entry driveway, and identify the dashed line (right of way/property line?). Add notation that a right of way permit must be obtained for this proposed modification. Contact Tucson Department of Transportation (TDOT) at 791-5100 for right of way permit inquiries and information.
STORMWATER POLLUTION PREVENTION PLAN (SWPPP):
1. Please provide a detail for the TOA, or stabilized construction entrance.
2. Provide contractors signed certification(s). All certifications must be signed, dated, and onsite upon commencement of earth disturbing activities.
3. Provide a detail or clearly specify the WOA depressed area dimensions and elevations, demonstrating containment of all washout materials.
4. Assure the SWPPP text and/or plan contains details for all control measures proposed for this project, including the secondary containment area, fully described and labeled.
5. Describe how and where a copy o the SWPPP will be retained onsite (Part IV J 1 - CGP).
6. Provide discussion and specify when and who shall be responsible for completion of the Site Inspection Report(s) (Appendix I).
7. Describe how and where the Operator will post a sign at the main entrance to the site containing: AZPDES authorization number (or copy of NOI authorization), construction site contact name and telephone number, brief project description, and location of the SWPPP if the site is inactive or does not have an onsite storage location (Part IV.J. 2 - CGP).
Please submit a response letter and revised site and grading plans addressing all comments provided above.
If you have any questions, I can be reached at 791-5550, extension 1189 or Doug.Williams@tucsonaz.gov
Doug Williams
Sr. Engineering Associate
Engineering Division
Development Services Department
12/01/2004 Andrew Connor NPPO REVIEW Passed

Final Status

Task End Date Reviewer's Name Type of Review Description
12/09/2004 TAMI ACHONG OUT TO CUSTOMER Completed
12/09/2004 SUE REEVES REJECT SHELF Completed