Permit Number: T04BU01950
Parcel: 103210240

Review Status: Completed

Review Details: REVISION - GRADING

Permit Number - T04BU01950
Review Name: REVISION - GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/02/2010 ELIZABETH EBERBACH ENGINEERING REVIEW Denied DATE: June 3, 2010
SUBJECT: Silverbell Vista Final Revision / As-built Grading Plan Resubmittal Review
TO: Urban Engineering (Bill Cowie, PE)
REVIEWER: E Leibold, PE
ACTIVITY NUMBER: T04BU01950
LOCATION: T13S, R13E, Section 33

SUMMARY: Silverbell Vista subdivision project closure documents were resubmitted for review by the City of Tucson 24MAY10. A field visit occurred 3JUN10 to assess preliminary punchlist items; a final inspection is required prior to final approval and additional punchlist items may be required after comments are addressed. A revised project closure package will be required to be submitted addressing the following comments. See comment 2 for lot 2 release information.

PRIVATE STREET, GRADING PLAN AND DRAINAGE ADDENDA COMMENTS:
1) DS Sec. 11-01.16: Address the remaining clarifications on the as-built plans on planview or details and/or drainage addenda:
a) DS Sec.11-01.16.1.D: Address the remaining drainage comments (as well as those items in comment 2) on plans as well as in drainage statement:
i) DS Sec.10-01.5.6: (See also comment 2d below.) Regarding the weir at west drop catch basin area, further explain how further erosion is/will be prevented from occurring, as there were indications from last summer storms that breakout erosion occurred at north and south ends of the concrete weir.
b) DS Sec. 11-01.16: Address the following comments pertaining to the drainage completion letter:
i) State that the existing basin percolates within the required 24 hour drain down time. Observations indicate ponding stormwater in the basin is occurring and in order for the basin to be accepted, drain down time must not exceed 24 hours. Submitting pre-constructed perc test results will not be accepted; post-construction test is required.
ii) State whether the drop catch basin, culverts have been cleaned out of sediments and/or debris. Field inspection on 3JUN10 indicated large rock and sediments in this inlet, as well as debris and trash in channels in various areas of the project.
c) For resubmittal, provide 2 copies of the revised as-built grading plans, one copy of the private street as-built improvement plans, elevation datum statement, and 2 copies of the revised drainage addenda, field reports, and engineer of record letters (substantial completion & drainage completion).
2) For release of lot 2, the following items need to be completed by a City of Tucson approved deadline:
a) Remove sediment control measures from basin, channels, scupper inlets.
b) The offsite north channel that conveys drainage from this subdivision's north lots shall be regraded to match the approved Silverbell Trails channel configuration.
c) After the offsite north channel is regraded, as-built elevations shall be provided with the revised grading plan set to show that the channel is graded to match the approved Silverbell Trails channel geometry and show positive gradient from the end of the channel near lot 18 toward Silverbell Road.
d) Elevation profile along west property boundary at west inlet structures shall be verified for conveyance for anticipated 100-year floodplain condition. Provide a drainage discussion, and if necessary, proposed revised design to address prevention of potential erosion at either end of concrete weir.
e) Provide percolation test for Northeast basin. This percolation test must be post-construction - not the design testing rate. There are indications and observations that this basin exceeds drain down time per City standards therefore a post-construction percolation test is required.
f) Provide erosion protection in swale west of lot 18 from existing placed gravel near front of lot to northwest corner of lot 18 at offsite north channel.
3) For further lot releases (beyond lot 2), project completion approvals, and assurance release, all of the comments must be addressed in comments 1 & 2 above. A meeting with the consultant is required before resubmittal to go over remaining comments.

If you have any questions, you are welcome to call me at 837-4934.

Elizabeth Leibold, PE, CPM, CFM
Civil Engineer
Engineering Division
Planning & Development Services
06/04/2010 MICHAEL ST. PAUL ZONING REVIEW Denied June 4, 2010

Development Services Department
Zoning Review Section

Michael St.Paul
Planning Technician

T04BU01950 Grading Plans for S03-033

Comments:

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Zoning will re-review the grading plan on the next submittal to ensure compliance with the CDRC approved and stamped tentative plat. Additional comments may be forthcoming.
06/11/2010 ANDREW CONNOR NPPO REVIEW Approv-Cond Ensure that all Engineering comments and concerns are addressed prior NPP / Landscape approval stamp.

Final Status

Task End Date Reviewer's Name Type of Review Description
08/02/2010 GERARDO BONILLA OUT TO CUSTOMER Completed
08/02/2010 SUE REEVES REJECT SHELF Completed