Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T04BU01574
Parcel: 122181810

Review Status: Completed

Review Details: RESUBMITTAL - GRADING ALL

Permit Number - T04BU01574
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/10/2005 BLANCA ESPINO ENGINEERING REVIEW Denied assigned by JPV
01/10/2005 BLANCA ESPINO ENGINEERING REVIEW Denied Site Plan
1. Please include a response letter with the next submittal that states how all comments have been addressed. Include plans/redlines from previous plan submittal.

2. Address comment number 1.

3. Submit a copy of a stamped approved site plan along with the grading plan for review. This is a previous review comment. It is difficult to determine what changes have been made or are intended to be made.

4. I'm including a copy of a previous review dated October 19, 2004. Address all 5 comments.


DATE: October 19, 2004
ACTIVITY NUMBER: T04BU01574
PROJECT NAME: Lecocq Apartments
PROJECT ADDRESS: 1204 N. Winstel
PROJECT REVIEWER: James C. Tate, P.E., CFM

The following items must be revised or added to
the Grading Plan. Please include a letter with
the next submittal addressing how all the engineering
and drainage comments have been addressed.

Resubmittal Required: Grading Plan, Drainage
Report

Grading Plan

1. A letter must be included in the next Grading
Plan submittal addressing all the engineering
and drainage comments. PREVIOUS REVIEW COMMENT

2. Include a copy of the stamped approved Site
Plan with the Grading Plan re-submittal. This
is a previous review comment. The stamped approved
Site Plan MUST be submitted. PREVIOUS REVIEW
COMMENT

3. Include a copy of a revised drainage report
with the next submittal. It appears that the
intention is to change the drainage from the
approved Site Plan. Changes to drainage must
be substantiated in a revised drainage report.
The Drainage Report submitted does not address
the changes that were made to the approved Site
Plan. The report must address any and all
proposed changes made to the approved plan. PREVIOUS
REVIEW COMMENT

4. Submit both Sheets C1 and C2 for approval
as a Grading Plan. The sheets must agree with
the approved Site Plan. They must also agree
with the revised Drainage Report. Label the Grading
Plan as "Grading Plan". PREVIOUS REVIEW COMMENT

Drainage Report

1. The Drainage report as submitted does not
address the changes that were made on the approved
Site Plan. The report treats this project as
a proposed development. However, the project
is almost complete. This is actually a revision
to the approved Site Plan. The Drainage Report
must address the proposed changes made to the
approved drainage structures and the effect this
will have on this property and adjoining properties.
There are also proposed changes to approved
elevations and FFE. These changes must also
be addressed in the Drainage Report as they affect
the drainage both on-site and off-site. The
approved Site Plan was not included in this submittal,
so it is difficult to determine what changes
have been made or are intended to be made. Existing
elevations both onsite and offsite are critical
in determining the proposed drainage patterns.
PREVIOUS REVIEW COMMENT
01/11/2005 Andrew Connor NPPO REVIEW Denied Submit approved tentative plat including landscape and NPP plans to continue review.
02/01/2005 David Rivera ZONING REVIEW Denied February 2, 2005

Development Services Department
Zoning Review Section

David Rivera
Senior Planner

Comments

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering and Landscape Review Section and approval of the site plan.

2. Two copies of the approved and stamped site plan, landscape and NPPO plans must be included with the grading plan.

3. Zoning will re-review the grading plan on the next submittal for compliance with all zoning comments.

Final Status

Task End Date Reviewer's Name Type of Review Description
02/02/2005 ANGIE SHOFFSTALL OUT TO CUSTOMER Completed