Permit Number: T04BU01574
Parcel: 122181810

Review Status: Completed

Review Details: RESUBMITTAL - GRADING

Permit Number - T04BU01574
Review Name: RESUBMITTAL - GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/19/2004 JIM TATE ENGINEERING REVIEW Denied DATE: October 19, 2004
ACTIVITY NUMBER: T04BU01574
PROJECT NAME: Lecocq Apartments
PROJECT ADDRESS: 1204 N. Winstel
PROJECT REVIEWER: James C. Tate, P.E., CFM

The following items must be revised or added to the Grading Plan. Please include a letter with the next submittal addressing how all the engineering and drainage comments have been addressed.

Resubmittal Required: Grading Plan, Drainage Report

Grading Plan

1. A letter must be included in the next Grading Plan submittal addressing all the engineering and drainage comments. PREVIOUS REVIEW COMMENT

2. Include a copy of the stamped approved Site Plan with the Grading Plan re-submittal. This is a previous review comment. The stamped approved Site Plan MUST be submitted. PREVIOUS REVIEW COMMENT

3. Include a copy of a revised drainage report with the next submittal. It appears that the intention is to change the drainage from the approved Site Plan. Changes to drainage must be substantiated in a revised drainage report. The Drainage Report submitted does not address the changes that were made to the approved Site Plan. The report must address any and all proposed changes made to the approved plan. PREVIOUS REVIEW COMMENT

4. Submit both Sheets C1 and C2 for approval as a Grading Plan. The sheets must agree with the approved Site Plan. They must also agree with the revised Drainage Report. Label the Grading Plan as "Grading Plan". PREVIOUS REVIEW COMMENT

Drainage Report

1. The Drainage report as submitted does not address the changes that were made on the approved Site Plan. The report treats this project as a proposed development. However, the project is almost complete. This is actually a revision to the approved Site Plan. The Drainage Report must address the proposed changes made to the approved drainage structures and the effect this will have on this property and adjoining properties. There are also proposed changes to approved elevations and FFE. These changes must also be addressed in the Drainage Report as they affect the drainage both on-site and off-site. The approved Site Plan was not included in this submittal, so it is difficult to determine what changes have been made or are intended to be made. Existing elevations both onsite and offsite are critical in determining the proposed drainage patterns. PREVIOUS REVIEW COMMENT
10/19/2004 Andrew Connor NPPO REVIEW Denied Submit approved site, landscape and NPPO plans to continue review.
11/07/2004 David Rivera ZONING REVIEW Denied November 7, 2004

Development Services Department
Zoning Review Section

David Rivera
Senior Planner

Comments

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering and Landscape Review Section and approval of the site plan.

2. Two copies of the approved and stamped site plan, landscape and NPPO plans must be included with the grading plan.

3. Zoning will re-review the grading plan on the next submittal for compliance with all zoning comments.

Final Status

Task End Date Reviewer's Name Type of Review Description
11/09/2004 DELMA ROBEY OUT TO CUSTOMER Completed