Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - GRADING ALL
Permit Number - T04BU01193
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/02/2004 | BLANCA ESPINO | ENGINEERING | REVIEW | Denied | Grading Plan 1. Please include a response letter with the next submittal that states how all comments have been addressed. 2. Submit two (2) identical grading plans for review that coincides with the same layout as per the approved site plan. Resubmit redlined grading plan to compare corrections. 3. Indicate a legend of symbols identifying objects on plan. 4. Indicate a General Note legend for formal information. 5. Indicate a revision cloud around revised area and a number inside a triangle to identify revision. Also indicate a library of revisions; a number inside a triangle with revised dates. 6. Grading plan dated 01-22-03 indicates quantities of cut = 45 c.y. and fill = 68 c.y. which is inconsistent with the approved site plan of cut = 250 c.y. and fill = 384 c.y. and the grading application. Correct and revise. 7. Remove interior layout of units. 8. Correct all text and symbol/line overlays. This makes it difficult to read. See redline grading plan for corrections. 9. Indicate contour intervals along with north arrow and scale. This should be placed together. D.S. 2-02.2.1.A.1 10. Indicate all existing buildings and structures, including roof slope and location of downspouts. D.S. 2-02.2.1.A.6 Indicate roof direction/drainage. Indicate a dimensioned detail of downspout and a symbol to be placed in the legend of symbols. 11. Drainage flowing across all pedestrian circulation paths shall be conveyed under the path for up to ten (10) year frequency flood events. D.S. 2-08.3.1 & 4.1.E 12. Add NOTE: All roof spouts will be routed under any adjacent sidewalk. Sidewalks shall be flood free for all storm discharges of up to a ten (10) year flood event. 13. Indicate drainage patterns, proposed finish floor elevation(s) and finish grades. D.S. 2-02.2.1.A.16 Indicate adjacent grades. 14. Do not obstruct on-site to off-site flows. Onsite discharge is not to impact adjacent properties. Demonstrate proposed drainage solutions, such as origin, direction, and destination of flow and method of collecting and containing flow. 15. Indicate existing topographic contours at intervals not exceeding two (2) feet and/or spot elevations as pertinent and Bench Mark based on City of Tucson Datum, including City Field Book and page number. D.S. 2-02.2.1.A.23 Use a different line weight or type to identify contour line. As per TDOT, the contour line is laid out incorrectly. Correct and revise. 16. Indicate spot elevations for walkway and asphalt. Verify FFE against drainage flow line elevation adjacent to pedestrian walkway. See grading plan for grade spot elevations to be identified. Red X marks are noted. 17. Indicate pedestrian walkway unimpeded around gas meter at Unit #2 (existing). 18. Indicate depth for swale on detail 3/C2. Indicate and label swale throughout site. 19. Indicate dimensioned details for sidewalk scuppers, basins, drainage inlets, and wall openings (drainage holes). 20. Indicate a dimensioned detail of catch basin on detail 4/C2. 21. Indicate lot size in acres. 22. Use a light line weight to identify all utilities. 23. Sidewalks within a project must be physically separated from any vehicular travel lane by means of curbing, grade separation, barriers, railings or other means, except at crosswalks, and must meet the following locational requirements. D.S. 2-08.4.1 thru 2-08.9.0 Refer to Standard Detail 209 Concrete vertical curb Type 2. 24. Indicate bicycle parking area. 25. Indicate a dimensioned detail of sidewalk scupper and specify Standard Detail 204 or 205. 26. Indicate existing and or proposed walls around and on project site. Indicate a dimensioned detail of wall. No structure over 30" high are to be placed in the sight visibility triangle. 27. Correct and revise details 2 & 3 to indicate slope percentage to .833% instead of 8.33%. |
| 06/03/2004 | Joseph Linville | NPPO | REVIEW | Denied | Submit approved landscape plans to continue review. |
| 06/28/2004 | David Rivera | ZONING | REVIEW | Denied | June 28, 2004 Development Services Department Zoning Review Section David Rivera Senior Planner 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering Review Section. 2. Two clean copies of the approved and stamped development/site plan, landscape and NPPO plans must be included with grading plan |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 06/29/2004 | BETH GRANT | OUT TO CUSTOMER | Completed |
| 06/29/2004 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |