Permit Number: T04BU01032
Parcel: 137055190

Review Status: Completed

Review Details: GRADING

Permit Number - T04BU01032
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/19/2004 Loren Makus ENGINEERING REVIEW Denied DATE: May 19, 2004
TO: Brent Steffenhagen, EIT; Stantec Consulting Inc.
SUBJECT: Lot 3 at West Point Crossing, Grading Plan
REVIEWER: Loren Makus
ACTIVITY NUMBER: T04BU01032

SUMMARY: The Grading Plan was reviewed by Development Services Department Engineering Division. The Grading Plan was not approved at this time.

Grading Plan comments:
1) The Development Plan must be approved before the grading plan can be approved. The Grading Plan must be consistent with the approved Development Plan. Include a copy of the approved Development Plan with the grading permit application.
2) Revise General Grading Note 7 to indicate that the grading will be in compliance with IBC 2000 Chapter 36.
3) Construction note 23 refers to "DTL ?" Identify and provide the corresponding detail.
4) A callout on sheet 2 refers to construction note 28 which does not exist. Identify or provide the correct construction note.

Revise the Grading Plan to address all of these comments and resubmit two copies for review along with a copy of the approved Development Plan. If you would like to meet with me to discuss any of these comments please call me at (520) 791-5550 ext. 1161 or email me at loren.makus@tucsonaz.gov.

Loren Makus, E.I.T.
Senior Engineering Associate
Engineering Division
Development Services
05/20/2004 Andrew Connor NPPO REVIEW Denied Submit approved Development Plan including landscape and NPPO plan to continue review.
06/08/2004 David Rivera ZONING REVIEW Denied June 8, 2004

Development Services Department
Zoning Review Section

David Rivera
Senior Planner

Comments:

Zoning will review and approve the grading plan once the Engineering review section has approved the grading plan.

Also, a site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO is required before the grading plan can be approved by Zoning. Two copies of the approved development/tentative plat plans are to be submitted with the building plans packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The development plan may be walked through for stamps and site card sign off. submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the grading plans packet processed together for site approval.

Final Status

Task End Date Reviewer's Name Type of Review Description
04/06/2005 TAMI ACHONG OUT TO CUSTOMER Completed
04/06/2005 ANGIE SHOFFSTALL REJECT SHELF Completed