Permit Number: T04BU00846
Parcel: 112050530

Review Status: Completed

Review Details: GRADING

Permit Number - T04BU00846
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/06/2004 BLANCA ESPINO ENGINEERING REVIEW Denied Grading Plan
1. Indicate note to Grading Notes: All roof spouts will be routed under any adjacent sidewalk. Sidewalks shall be flood free for all storm discharges of up to a 10-year flood event.

2. Indicate note to Grading Notes: The project site is in a FEMA Floodplain, Zone AE as per Panel 1639K, dated February 8, 1999.

3. Indicate Qs of acceptance and discharge for project site, V-ditch and retention basin.

4. Indicate outline of Detail P/4 on Site and Grading Plan.

5. Indicate V-ditch to Detail Q/4.

6. Indicate wse, ditch bottom elevation and flow arrows for V-ditch.

7. Indicate proposed contour lines.

8. Indicate Grade Break locations. Indicate Grade Break symbol to legend.

9. Indicate if there is a wall on the north side of the property. If so, the backup spur requires an area of 3 feet from the wall. Correct and revise.



STORM WATER POLLUTION PREVENTION PLAN.
Each operator is responsible for submitting a completed NOI to ADEQ and to the City of Tucson. The contractor for the development is required to submit an NOI to ADEQ and a copy to the City of Tucson. Approval of the SWPPP is not contingent on this fact. (Part IV.F)

A description of the intended sequence of soil disturbing activities is required which has been addressed. However Stormwater controls need to occur first prior to earthwork. The site map addresses this however the narrative included stormwater controls after grubbing. This is incorrect. Stormwater controls need to be in place prior to any earthwork activities. Revise as necessary. (Part IV.C.2.b)

Provide in the narrative a general location map showing and identifying receiving waters within 1 mile. (Part IV.C.2.e)

In the narrative on page 10, non-stormwater discharges are listed however the stormwater controls (Best Management Practices BMP) are not. Describe the BMPs for nonstorm discharges for the development. (Part IV.D.7)

If sediment does leave the site, off-site accumulation of sediment must be routinely removed to ensure no adverse effects on water quality. Explain how the construction site will do this. (Part IV.D.2.c)

The Native Plant Preservation Plan has three native mesquites proposed to be preserved in place. Document the areas where existing vegetation will be preserved on the site map. (Part IV.D.4.a)

In areas where construction has temporarily or permanently ceased, stabilization measures must be implemented within 14 days. If construction will resume within 14 days, then no stabilization measures are needed. Explain how the site will address stabilization if construction temporary or permanently ceased. (Part IV.D.4.b.)

Section 7, Maintenance and Inspection, page 10, it states that built up sediment will be removed. How much built up sediment? It is required to remove sediment from sediment controls when design capacity has been reduced by 50%. Revise this section of the narrative. (Part IV.E.3)

Put all the even pages of the General Permit in the narrative. The “Entire” copy of the AzPDES permit is required to be in the narrative. (Part IV.F)

Include this as a general statement in an appropreiate section of the narrative and on the site map; Report oil or hazardous materials releases in excess of reportable quantities, or that may endanger human health or the environment, within 24 hours to ADEQ: (602) 771-4466 FAX (602) 771-4505. (Part VI.L.5.a)

The following records of stabilization must be maintained:

Dates when major grading activities occur.
Dates when construction temporarily or permanently ceases on a portion of the site.
Dates when stabilization measures are initiated and completed.

Include this in the inspection form section of the narrative. (Part IV.D.4.c.)
04/22/2004 DAN CASTRO ZONING REVIEW Denied Zoning will review the grading plan after Engineering has approved it.
04/28/2004 Joseph Linville NPPO REVIEW Denied Protected Native Plants to be preserved-in-place shall remain undisturbed for the circumference of the drip line of the trees. Under no circumstances shall grading encroach to the base or trunk of a preserved plants per DS 2-15.6.0.A. According to Detail D on sheet 3 a 1.5-ft. space is indicated between paved area and existing wall this will not satisfy the development standard. Revise the grading, site, and landscape plans as necessary

Final Status

Task End Date Reviewer's Name Type of Review Description
04/29/2004 TAMI ACHONG OUT TO CUSTOMER Completed
04/29/2004 ANGIE SHOFFSTALL REJECT SHELF Completed