Permit Review Detail
Review Status: Completed
Review Details: REVISION - GRADING
Permit Number - T04BU00623
Review Name: REVISION - GRADING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/02/2007 | ANDREW CONNOR | LANDSCAPE | REVIEW | Needs Review | |
01/05/2007 | PAUL MACHADO | ENGINEERING | REVIEW | Denied | To: Steve Gregor, P. E. DATE: January 5, 2007 Gregor and Grenier Engineering Inc. 5232 E. Pima St., Ste. A Tucson, Arizona 85712 SUBJECT: Camp Lowell Corner, 3175 N. Swan Road Grading Plan T04BU00623 (Revision Review) T14S, R15E, Section 28 RESUBMITTAL REQUIRED: Revised Grading Plan. The Grading Plan (GP) Grading Plan: 1. Please include a response letter to the comments along with the corrected copies of the GP. 2. Ramp runs with a rise greater than 6 inches shall have handrails complying with Section 505 per the IIC 2003 Chapter 405.8. The ramp at the NE corner of the property requires the installation of handrails. If you have any questions, I can be reached at 791-5550 x1193 or pmachad2@ci.tucson.az.us Paul P. Machado Senior Engineering Associate City of Tucson/Development Services Department 201 N. Stone Avenue P.O. Box 27210 Tucson, Arizona 85726-7210 (520) 791-5550 x1193 office (520) 879-8010 fax 3175 N. Swan RD. grad rev |
01/09/2007 | MICHAEL ST. PAUL | ZONING | REVIEW | Denied | CDRC TRANSMITTAL FROM: Michael St.Paul, Planning Technician PROJECT: T06BU00623gradrev Revision of grading plan for D03-0023 3175 North Swan Road TRANSMITTAL: January 9, 2007 COMMENTS: Please attach a response letter with the next submittal, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. Please provide a copy of the stamped approved site plan which is bases upon the stamped approved development plan. NPPO and Engineering approval is required prior to approval from Zoning. Please provide a copy of the approved grading plan that is being revised. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/24/2007 | FSANCHE1 | OUT TO CUSTOMER | Completed |
01/24/2007 | SUE REEVES | REJECT SHELF | Completed |