Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T04BU00250
Review Name: GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/20/2004 | Doug Williams | ENGINEERING | REVIEW | Approved | The Stormwater Pollution Prevention Plans (SWPPP's) are approved WITH THE FOLLOWING CONDITIONS: 1. The contractor's SWPPP narrative (Contractors Report) and Notice of Intent (NOI) must be completed and signed. Copies of the signed NOI forwarded to Arizona Department of Environmental Quality (ADEQ), and the Contractors report shall be included with the SWPPP/text, to be kept onsite at all times. ADEQ MUST RECEIVE THE NOI AT LEAST 2 BUSINESS DAYS BEFORE THE CONTRACTOR COMMENCES ANY WORK ONSITE. 2. Depict and label an appropriate vehicle/equipment washout location on the SWPPP. 3. Depict and label an acceptable protected onsite material storage area on the SWPPP. 4. Depict and label a stabilized construction entrance, with a detail and/or reference to Stormwater Pollution Control Measure 39 of 39, provided in the text. 5. A right of way permit must be obtained from Permits and Codes Section, Engineering Division - Tucson Department of Transportation, for the construction entrance installation and any excavation or development within the public right of way - call 791-5100 for questions. |
| 03/02/2004 | PATRICIA GEHLEN | ZONING | REVIEW | Denied | Zoning Grading plans may not be reviewed until the site plan is approved. |
| 03/02/2004 | Andrew Connor | NPPO | REVIEW | Denied | Submit a native plant preservation plan. LUC 3.8 |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/03/2004 | LISA LESNY | OUT TO CUSTOMER | Completed |
| 03/03/2004 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |