Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - GRADING ALL
Permit Number - T04BU00122
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/03/2004 | Andrew Connor | NPPO | REVIEW | Denied | Revise the grading plan to limit grading in the vicinity of protected native plants. All plants designated by the approved Native Plant Preservation Plan to be preserved-in-place shall be retained at their existing grade during and after construction. Preservation fencing per DS 2-06. Figure 1 is required to be installed beyond the "drip-line" of the vegetation by one-half (½) the distance of the "drip-line" radius. DS 2-15.6.A Prior to any site disturbance a pre-grading inspection is required. Inspections may be scheduled by calling the IVR system at (520) 740-6970, inspection #9015 or by calling the Landscape Field Representative directly at 791-5640 Ext. 1140. |
| 05/14/2004 | Doug Williams | ENGINEERING | REVIEW | Denied | SUBJECT: Desert Vista Grading, Paving and Sewer Plan review REVIEWER: Doug Williams DATE: 18 March 2004 ACTIVITY NUMBER: T04BU00122 T15S, R13E, Section 13 Resubmittal Required: Revised Grading, Paving & Sewer Plans SUMMARY: Engineering Division has reviewed the subject plans. All previous comments have not been fully addressed. Approval is not recommended at this time. The following comments must be addressed prior to resubmittal. See redlines on plans for additional information. 1. It appears the inlet to the detention basin had been previously overlooked for conformance to Development Standard requirements for conveyance of flow under all sidewalk areas. Sidewalk scuppers must be constructed at the basin inlet to convey at a minimum, 100% of the 10-year flow under the sidewalk area. Please submit hydraulic calculations demonstrating sufficient scupper conveyance, with clogging, and revise the plan accordingly (DS 2-08.5.1 E & 3-01.4.4 F). 2. Please provide details for a removable handrail, as the COT/PC standard detail referenced does not provide for removable-type handrails, or revise the labeling on Detail I and Section E-E (Sheets 2 of 2 on grading and 4 of 4 on paving/sewer plans). 3. Revise sheet numbering to include all sheets submitted for grading and paving/sewer plan review and approval. 4. Depict, label and dimension the existing channel notch and basin outlet to be constructed, and provide detailed construction drawings for the outlet construction, fully dimensioned and labeled with all elevations noted. Include a detail or details for the proposed wall openings, with clear notation of the number of openings, opening width and height, with clear depiction of this location on plan view. 5. Provide cross sections for typical perimeter grading. Ensure all property lines, setbacks, walls and footers at a minimum are depicted. 6. Provide the top of basin elevation and revise the 3:1 slope indicated adjacent to the concrete spillway inlet in the "Basin A plan" detail - the plan view on sheet 1 indicates there's insufficient space to construct such a slope with a 4.5' deep basin at this location (sheet 2 of 2). 7. Specify concrete with minimum PSI noted, at a minimum, or reference the appropriate City of Tucson/Pima County Standard Specification for construction of the basin spillway inlet in section D-D, sheet 2 of 2. 8. Correct the "Bluestake" number provided on the Sewer and Paving Plan. 9. Reference the most current edition (2003 Edition) of the Standard Specifications for Public Improvements in the City of Tucson and Pima County (PC/COT SSPI) in General Note # 4. 10. Indicate recommended scour protection, if any, for the CMP outlet in the Basin A Plan, sheet 4 of 4. 11. Provide dimensioning for the riprap dissipater in detail I, sheet 4 of 4. 12. Revise the City of Tucson Public Improvement Plan title block format on all subsequent private grading/paving plan submittals. 13. Please provide a legend on all subsequent grading plan submittals. *NOTE* A right of way permit is required for any construction, excavation or development related work activity in the public right of way. Contact Permits and Codes Section, Transportation Department (TDOT) at 791-5100 for questions or inquiries. Resubmittal will require scupper conveyance calculations, three (3) sets of Stormwater Pollution Prevention Plans, and three (3) sets of revised Grading Paving and Sewer Plans addressing all of the comments provided above. If you have any questions, I can be reached at 791-5550, extension 1189 or Dwillia1@ci.tucson.az.us. Douglas Williams Sr. Engineering Associate Engineering Division Development Services Department |
| 05/18/2004 | DOUG WILLIAMS | NPDES | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 06/02/2004 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
| 05/20/2004 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |