Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T03OT01923
Parcel: Unknown

Review Status: Completed

Review Details: FLOODPLAIN

Permit Number - T03OT01923
Review Name: FLOODPLAIN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/03/2003 JIM TATE ENGINEERING REVIEW Denied DATE: November 18, 2003
ACTIVITY NUMBER: T03OT01923
PROJECT NAME: Sam Hughes Place
PROJECT ADDRESS: 446 N. Campbell
PROJECT REVIEWER: James C. Tate, P.E.

Resubmittal Required: Flood Use Permit Application

1. The Drainage Report must determine the minimum finish floor elevation for all structures in the floodplain. The finish floor must be a minimum of one foot above the highest WSEL at any point on any structure in the floodplain. A structure is defined as "a walled and/or roofed building". Structures include garages. The minimum FFE for the garages must be one foot above the WSEL. The information on FFE submitted in the Drainage Report will be used on the elevation certificates as the minimum requirements.

2. Please resubmit the FUP application with the next Grading Plan submittal. Additional copies of the plans and drainage report are not required with the FUP application. The Grading Plans will be stamped with flood plain approval.

Final Status

Task End Date Reviewer's Name Type of Review Description
12/01/2003 CINDY AGUILAR OUT TO CUSTOMER Completed