Permit Number: T03OT00638
Parcel: 14108522A

Review Status: Completed

Review Details: SITE

Permit Number - T03OT00638
Review Name: SITE
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/23/2003 PAUL MACHADO ENGINEERING REVIEW Denied To: James R. Watson
Architect
5672 E. Kelso Street
Tucson, Arizona 85712

SUBJECT: 6800 E. Century Park Drive
Site plan T03OT00638 (Second Review)
T15S, R15E, Section 18

RESUBMITTAL REQUIRED: Site Plan and Drainage Statement.

The Site Plan (SP) and Drainage Statement (DS) cannot be approved as submitted. Please address the following review comments prior to the next submittal.

Site Plan:

1. Please include a response letter to the comments along with the corrected copies with the resubmittal. Per previous comment.
2. A rough grading plan only exists under T00CM02665. A separate grading submittal is required. Per our telephone conversation, I explained why a grading plan is needed. Please remove note number 22 or revise with the new grading activity number.
3. It appears that a large portion of the parcel is draining to the North into the existing drainageway. Please address.
4. Please provide Drainage patterns and finished grades per D.S. 2-02.2.1.16. The drainage patterns are sufficient, but finished grades are needed particularly near the street and buildings.
5. Grading in excess of 5,000 cubic yards shall be performed in accordance with an approved grading plan prepared by a registered civil engineer per Section 9.3 of the 2000 IBC.
6. It appears that the fill being exported is some type of berm. How will this impact the existing building?
7. Please submit the updated DS along with the site plan resubmittal.
8. Show how the drainage will enter the existing drainageways and its stabilization materials or structure.
Drainage Statement:
1. It appears that a large portion of the parcel is draining to the North. Please address.
2. It appears that the fill being exported is some type of berm. How will this impact the existing building?
3. Please state in the DS that you have reviewed the data in the report by Jerry Jones & Assoc. and agree to the data. Per previous comment.
If you have any questions, I can be reached at 791-5550 x1193 or pmachad2@ci.tucson.az.us
Paul Machado
Senior Engineering Associate
06/24/2003 ANY SANITATION REVIEW Approved
07/03/2003 JOE LINVILLE LANDSCAPE REVIEW Approved
07/03/2003 JOE LINVILLE NPPO REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
09/09/2003 LISA LESNY OUT TO CUSTOMER Completed
07/07/2003 LISA LESNY REJECT SHELF Completed