Permit Review Detail
Review Status: Completed
Review Details: SITE
Permit Number - T03OT00638
Review Name: SITE
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/15/2003 | JIM EGAN | FIRE | REVIEW | Approved | |
| 04/25/2003 | JOE LINVILLE | NPPO | REVIEW | Denied | The NPPO submittal must include a plant preservation and salvage plan and a salvage and mitigation report. DS 2-15.3.4 The submittal must also include a copy of the previously approved plans for comparison with the revised plans. |
| 04/25/2003 | JOE LINVILLE | LANDSCAPE | REVIEW | Denied | Include a summary of any plants required to meet the requirements of the NPPO Plan. Show the disposition of any PIP, TOS, and required mitigation. DS 2-15.3.4.B.2 See NPPO comments. The loading areas must be screened from the street per LUC Table 3.7.2-I with a six foot high masonry wall. |
| 05/02/2003 | DAN CASTRO | HANDICAP-SITE | REVIEW | Passed | |
| 05/02/2003 | DAN CASTRO | ZONING | REVIEW | Approved | |
| 05/05/2003 | PAUL MACHADO | ENGINEERING | REVIEW | Denied | To: James R. Watson Architect 5672 E. Kelso Street Tucson, Arizona 85712 SUBJECT: 6800 E. Century Park Drive Site plan T03OT00638 (First Review) T15S, R15E, Section 18 RESUBMITTAL REQUIRED: Site Plan and Drainage Statement. The Site Plan (SP) and Drainage Statement (DS) cannot be approved as submitted. Please address the following review comments prior to the next submittal. Site Plan: 1. Please include a response letter to the comments along with the corrected copies with resubmittal. 2. A rough grading plan only exists under T00CM02665. A separate grading submittal is required. 3. It appears that the lot coverage calculations in the DS differ from the lot calculations on the SP. Please address. 4. Total lot coverage calculation should be calculated per lot, unless a lot combination has been applied for. 5. Please provide Drainage patterns and finished grades per D.S. 2-02.2.1.16. 6. Please list estimated cut & fill quantities per D.S. 2-02.2.1.17. 7. Please provide existing topographic contours at intervals not exceeding two (2) feet and/or spot elevations as pertinent and Bench Mark based on City of Tucson Datum, including City Field Book and page number per D.S. 2-02.2.1.23. 8. A private improvement agreement or permit will be necessary for any work performed within the Right-of-way. Contact Permits and Codes at (520) 791-5100 for permit information. 9. Please show a typical cross section of the P.A.A.L. or call out the percentage of slopes. Call out the GB at the D/W, if applicable. 10. List the consulting engineer and the owner/developer on the plans with the pertinent information. 11. Add note: "Depress all landscaped areas 6" maximum for water harvesting". Drainage Statement: 1. It appears that the lot coverage calculations in the DS differ from the lot calculations on the SP. Please address. 2. Total lot coverage calculation should be calculated per lot, unless a lot combination has been applied for. 3. Please state in the DS that you have reviewed the data in the report by Jerry Jones & Assoc. and agree to the data. If you have any questions, I can be reached at 791-5550 x1193 or pmachad2@ci.tucson.az.us Paul Machado Senior Engineering Associate |
| 05/06/2003 | ANY | SANITATION | REVIEW | Passed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/29/2003 | TAMI ACHONG | OUT TO CUSTOMER | Completed |
| 05/06/2003 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |