Permit Number: T03OT00089
Parcel: 121120420

Review Status: Completed

Review Details: SITE

Permit Number - T03OT00089
Review Name: SITE
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/07/2003 JIM EGAN FIRE REVIEW Approved
02/19/2003 DAN CASTRO HANDICAP-SITE REVIEW Passed
02/19/2003 DAN CASTRO ZONING REVIEW Denied COMMENTS: Please attach a response letter with the next submittal, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.
CODE SECTION/ DEVELOPMENT STANDARD

1. a) It appears that the property has been split since the last site plan was approved in 1989. Please provide a copy of the lot split plan approved by the City of Tucson. If the lot split has not been approved by the City of Tucson, the site plan for the parking lot may not be approved until the lot split is approved. Please contact me at the number below for information on the lot split process.
b) If the lot has been split and approved by the City, a lot combination covenant tying together the vehicle parking in both lots will be required. Attached is a copy of the City of Tucson Lot Combination Covenant, which must be recorded and a copy of the recorded covenant must be submitted to the Zoning Review Section prior to site plan approval.

2. Label and dimension existing and future sight visibility triangles.
D.S. 2-02.2.1.A.10

3. Label and dimension existing and future right-of-way for Speedway Blvd.
D.S. 2-02.2.1.A.19

4. Label and dimension existing and future curb location along Speedway Blvd.
D.S. 2-02.2.1.A.21
02/25/2003 JOE LINVILLE NPPO REVIEW Approved Exception, LUC 3.8.3.5.E
02/25/2003 JOE LINVILLE LANDSCAPE REVIEW Denied 1) Development on this site is subject to the regulations in effect the last time the site was approved for zoning compliance, except for parking expansion areas which are subject to the current regulations. LUC 3.7.1.2
Revise the plans to identify and dimension areas of required/existing landscaping. All landscaping as approved for zoning compliance on 04/21/89 is still required and must be included on the plan. The previous plans include a landscpe buffer along the entire frontage as well as
other landscape areas.
2) Current regulations require at minimum the following:
A) Screening of the parking areas along Speedway and Beverly Boulevards per LUC 3.7.2-I. See also DS 2-06.3.7(A-D).

B) Street landscape borders along Speedway and Beverly which measure at least ten feet wide from the MS&R right of way line. Show the MS&R right of way line on the plans.
LUC 3.7.2.4.A

C) The tree planter proposed within the vehicular use area must measure at least four feet wide and contain a minimum of thirty-four square feet. LUC 3.7.2.3.A.1.c
03/10/2003 BLANCA ESPINO FLOODPLAIN REVIEW Approved
03/10/2003 BLANCA ESPINO ENGINEERING REVIEW Denied Site Plan
1. Existing and future svt's required.
2. Note cut and fill amounts.
3. Note if Speedway Blvd. is Public or Private.
4. Indicate existing and future R.O.W.
03/10/2003 BLANCA ESPINO SANITATION REVIEW Passed

Final Status

Task End Date Reviewer's Name Type of Review Description
03/10/2003 CINDY AGUILAR OUT TO CUSTOMER Completed