Permit Review Detail
Review Status: Completed
Review Details: ELECTRICAL
Permit Number - T03EL00900
Review Name: ELECTRICAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/13/2004 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T03CM00900 DENIED 2/13/04 1. It appears that the load on Circuit B1-4 should be allocated to B1-6. 2. Show location of all equipment in plan view, on a scaled drawing. 3. Show the Grounding Electrode System at the new service, and the sizing of its components. 4. Indicate utility available fault current and show fault calculations for AFC at panels. |