Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T03CM05730
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/14/2004 | JIM EGAN | FIRE | REVIEW | Approved | |
01/14/2004 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide water supply calculations per Section 610.1, UPC 1994. Include table of fixture units for all of the fixtures being supplied (Section 610.1) and the data required in Section 610.7. 2. Provide water supply isometric. 3. Provide vents for floor sinks. Reference Section 901.1, UPC 1994. 4. Provide backflow protection for all directly connected equipment that is not equipped with either a listed, integral backflow device or an air gap. Reference Section 603.0, UPC 1994. 5. Coordinate the equipment schedule with the plumbing floor plan and isometrics. |
01/14/2004 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T03CM05730 DENIED 1/14/04 1. On Circuit A-10, Coffee Grinder is listed at 200 VA. Per the Equipment Schedule, this equipment draws 9A, which would total 1080 VA. Please clarify/correct. 2. On Circuit A-16, Dishwasher is on a 20/1 CB. Per the Equipment Schedule, this equipment is 240V, which would need a 2-P CB. Please clarify/correct, and re-evaluate VA. 3. On Circuit A-18, REf. Display Case is listed at 200 VA. Per the Equipment Schedule, this equipment draws 12A, which would total 1440 VA. Please clarify/correct. 4. Equipment Schedule lists (2) Expresso Grinders as Item #3. No power to such equipment. Please clarify/correct. 5. Provide lighting fixture schedules. This is a submittal requirement. 6. Provide Interior Lighting Power calculations per the 1998 IECC. |
01/14/2004 | ROBERT SHERRY | WATER | REVIEW | Approved | |
01/14/2004 | PATRICIA GILBERT | ENGINEERING | REVIEW | Approved | |
01/14/2004 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
01/20/2004 | MARTIN HAEBERLE | BUILDING-COMMERCIAL | REVIEW | Z_DO NOT USE | |
01/21/2004 | GERRY KOZIOL | WWM | REVIEW | Approved | |
12/17/2003 | CRAIG GROSS | ZONING | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/21/2004 | LISA LESNY | OUT TO CUSTOMER | Completed |