Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-COMMERCIAL
Permit Number - T03CM05672
Review Name: 3RD PARTY REVIEW-COMMERCIAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/09/2004 | EROSE1 | WWM | REVIEW | Needs Review | |
02/09/2004 | EROSE1 | ENGINEERING | REVIEW | Needs Review | |
02/09/2004 | GP | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | ARCHITECTURAL COMMENTS Sheet A2.6 1. A square graphic, identified by the number 2 in an ellipse, is shown near a location that could represent attic access. Please clarify the intent. Ref. IBC 1208.2. Sheet A.0 1. The International Mechanical Code is noted as the 1998 edition. The 2000 edition is the correct reference. Please delete the 1998 reference. Sheet A9.1 1. Call out bond beam specifications for screen wall detail 7/A9.1. Restated. STRUCTURAL COMMENTS The structural portion has been reviewed and approved for buildings 2 through 6 only. Building #1 General 1. Complete Structural Calculations including design spread footings missing from this submittal package. Specifically address foundation design at steel frame columns where compression, shear and lateral moment are applicable. Comments restated. 2. Provide computer print out for service reactions at steel frames as required for basic anchor bolt design. Then address total shear and tension interaction check per IBC 1913. Sheet S1.3 1. Recheck adequacy of BC9* steel beam along Line 3 between Gridlines A-B. See page 57B for reaction developed from FB14 beam (BC12*) plus reaction from FB5 from opposite side and reaction from FB4 and shorter BC3 beam indicates beam is overstressed per independent check. Please verify as calculation for this particular beam is missing. PLUMBING COMMENTS Sheet P2.0 1. The 2" gas line with a developed length of 300 feet and demand of 1800 cfh requires a 3" line. Restated. Ref. UPC 12717. MECHANICAL COMMENTS-The mechanical portion has been reviewed and approved. ELECTRICAL COMMENTS-The electrical portion has been reviewed and approved. ENERGY COMMENTS General 1. Provide energy code compliance data for buildings 2-6. |
02/09/2004 | ELAINE ROSE | ZONING | REVIEW | Needs Review | |
02/09/2004 | EROSE1 | FIRE | REVIEW | Needs Review | |
02/12/2004 | ROBERT SHERRY | WATER | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/09/2004 | ELAINE ROSE | OUT TO CUSTOMER | Completed |