Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: REVISION
Permit Number - T03CM05546
Review Name: REVISION
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/22/2004 | Neil Saunders | BUILDING-RESIDENTIAL | REVIEW | Denied | Plan Check Comments - Project T03CM05546 Plan Review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, we request that you please provide revised plans and calculations, highlighting any changes, along with a written response to each of the noted items indicating action taken. General Requirements 1. All corrections and revisions shall be made on the original tracings and two new sets of prints or (1) sepia and (1) blue line shall be returned. 2. Pen or pencil corrections on final prints will not be acceptable. To avoid delays ensure that corrections have been made, are complete and have been coordinated on all-applicable details and notes. Foundation Plan 1. Provide landings at all new exterior doors per R311. Floor Plan 1. Provide all window sizes and types, and designate the operable portion of windows, as well as the location of tempered glass per R308.4. 2. Identify ceiling heights in all areas on floor plan. 3. Detail and specify stair width (minimum 36" per 311.5.1), rise and run (minimum 10" tread depth and 7 ¾" maximum riser height per R311.5.3), landing width (per R311.5.4), handrail heights (per R311.5.6.1), guardrail height (per R312.1) and intermediate rail spacing (per R312.2). IF APPLICABLE. Structural Plan 1. Size all interior-bearing headers. 2. Epoxy at ledger connection requires special inspection. Submit form. 3. 3/A4 - Provide anchor bolt spacing per R606.10 (1). 4. Provide CMU construction notes (vertical and horizontal reinforcing, etc) on one of the details. Elevations 1. Provide elevations for new layout. 2. Indicate all materials used; stucco, concrete block, glass block, roofing system, siding, veneer, etc. Plumbing Plan 1. Provide vent for washer stack. Mechanical Plan 1. Locate new AC. 2. Is dryer gas or electric? If gas provide gas line diagram, load calcs and pipe sizes. If electric provide outlet. 3. IF new AC is provided why is it necessary to attach new mechanical ducts to existing ducts? Electrical Plan 1. Provide smoke detectors in bedroom and in hallway. 2. Note that at least one 20 AMP branch circuit shall be installed to serve the laundry room and this circuit shall have no other outlets, per E3603.3 and 3801.8. 3. Note location of 400 amp panel and required clearances per E3305. 4. Check receptacle spacing per E3801.2. 5. Panel A should reflect subpanel B feed. If you have any questions, please contact your assigned plans examiner Neil Saunders at 791-5550, extension 1113. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 11/29/2004 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
| 11/29/2004 | SUE REEVES | REJECT SHELF | Completed |