Permit Number: T03CM05462
Parcel: 13419042C

Review Status: Completed

Review Details: 3RD PARTY REVIEW-COMMERCIAL TI

Permit Number - T03CM05462
Review Name: 3RD PARTY REVIEW-COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
12/08/2003 EROSE1 WWM REVIEW Needs Review
12/08/2003 STANTEC 3RD PARTY REVIEW-COMMERCIAL REVIEW Denied SCOPE OF REVIEW:

The scope of this review covers Architectural, Structural, Plumbing, Mechanical and Electrical. All features were checked only to the extent allowed by the submittal provided. All portions of the project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval.

GENERAL:

q There are no general comments to be addressed.

ARCHITECTURAL:

q There are no architectural comments to be addressed.

STRUCTURAL:

q See mechanical comments for coordination request between structural and mechanical drawings.

q The special inspection certificate submitted does not list field welding as required (it is noted as N/A). How are the new tube steel braces welded to the existing round steel pipe columns if not in the field (Detail 212 on Sheet S5.1)? Please clarify. Also, the engineer of record indicates on Sheet S1.1 that soils require special inspection for this job. If this is correct, then please provide a special inspection for this as well (otherwise modify the special inspection list).

MECHANICAL:

q The locations of two of the new mechanical units differ between the structural drawings (Sheet S3.1) and the mechanical drawings (Sheet M1). Please coordinate. Reference grid intersections C20 and E22 as shown on the mechanical drawings (the structural grid is severely misaligned). Also reference Sheet A2.2 for locations

PLUMBING:

q There are no plumbing comments to be addressed.

ELECTRICAL:

q Does the relocated scissor lift (shown on Sheet A2.0, keyed note 21) require the relocation of power? Please verify.

-End of Review-
12/08/2003 EROSE1 WATER REVIEW Needs Review
12/08/2003 EROSE1 FIRE REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
12/08/2003 ELAINE ROSE OUT TO CUSTOMER Completed