Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-COMMERCIAL
Permit Number - T03CM05344
Review Name: 3RD PARTY REVIEW-COMMERCIAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/05/2004 | EROSE1 | WWM | REVIEW | Needs Review | |
01/05/2004 | EROSE1 | ENGINEERING | REVIEW | Needs Review | |
01/05/2004 | GP | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | ARCHITECTURAL COMMENTS Sheet 1.1 1. Provide the IBC item number from table 719.1(2) or the listing number from an approved testing agency for the fire resistive assembly. 2. Note maximum threshold bevel of 50%. Ref. IBC 1003.3.1.6. 3. Provide a construction dimension for door 17. Sheet 1.5 1. Provide revised detail references to 3/6.2 and 5/6.2. There is no Sheet 6.2 in this plan set. Sheet 2.0 1. Provide construction details for the site walls. Note the heights and linear distance totals for the cmu walls and chain link fences to be constructed. STRUCTURAL COMMENTS General 1. Design loads specify a soil bearing pressure value of 1,000 psf per Western Technologies report #2923 JX022. Neither this value or recommendations for engineered foundations were found in the report submitted for review. 2. Page 7 of the soil report is missing. Please provide with the resubmittal. Sheet S1 1. General notes indicate an assumed soil bearing pressure of 1500 psf. Please resolve discrepancy with design load criteria. Sheet S2 1. Footing details are not consistent with slab tendon details on Sheet PT3. Please clarify. PLUMBING COMMENTS Sheet 15.1 1. In the plumbing wall common to units 2 and 3 revise the waste line size from 4" to 2" at the branch from the lavatories. Ref. UPC Table 7-5. 2. Delete the text and graphics that do not apply in the previously referenced plumbing wall. 3. Correct the flow direction of the 4" line at unit 2. 4. In unit 1, revise the branch line sizes at the water closets to 3". Ref. UPC Table 7-5. 5. In unit 1, label the 2" branch line from the kitchen. Ref. UPC Table 7-5. 6. Label the 2" branch line from the service sink. 7. Note that showers will have control valves of the pressure balance or thermostatic mixing valve type. Ref. UPC 410.7. 8. Include the service sink in the plumbing specifications and fixture unit tabulation. 9. Only partial venting is shown. Please complete. 10. Provide drinking fountain or note bottled water in an accessible location. Ref. IBC 2902.1. Sheet 15.2 1. Complete vent size call outs or note as 2" typical. 2. Include the service sink in isometric D/15.2. 3. Revise isometric D/15.2 to show the laundry and office downstream from unit 1. 4. Show the floor drains in unit 2 on isometric C/15.2 and in the fixture unit tabulation. 5. Show the end of line cleanout in isometric C/15.2. 6. Coordinate the typical water service size for units 1-4 with Sheet 15.1. Ref. UPC 610. 7. Complete line sizing in typical sewer drawing. Show cleanouts. Ref. UPC 707.4. 8. Show waste line sizes for recreation / office area. 9. Show pressure and temperature relief line sizes, paths and point of termination. Ref. UPC 608. MECHANICAL COMMENTS Sheet 15.3 1. Mechanical note is unclear. It appears the word not should be "note". Clarify. 2. Complete the outside air tabulation for recreation area. Ref. IMC 403.3. 3. Show the duct size to the return air grill for the typical unit. 4. No supply air is shown to the bathrooms in the typical unit. Please clarify. 5. Note the kitchen required outside air requirement of 25 cfm is continuous or 100 cfm intermittent. Ref. IMC Table 403.3. 6. Please clarify why .5 cfm/sf is used as outside air for the recreation area. ELECTRICAL COMMENTS Sheet 16.1 1. Show the means of disconnect and WP/GFCI outlet for rooftop mechanical units. 2. Indicate smoke alarm circuit information. Sheet 16.2 1. The apartment drawing is incorrectly oriented in the east - west direction. ENERGY COMMENTS - The energy portion has been reviewed and approved. |
01/05/2004 | ELAINE ROSE | ZONING | REVIEW | Needs Review | |
01/05/2004 | EROSE1 | WATER | REVIEW | Needs Review | |
01/05/2004 | EROSE1 | FIRE | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/05/2004 | ELAINE ROSE | OUT TO CUSTOMER | Completed |