Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T03CM05287
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/20/2004 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Denied | 1) Where do the details on sheet S4(104,103, and 107) apply? |
03/01/2004 | Linda Buczynski | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT LBUCZYN1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. 1. 5 KW Heaters would draw 13.9 A at 208V 3-phase. Therefore their overcurrent protection would be dictated by NEC 422-11 (e) (3). (13.9) (1.%0 = 20.8. The maximum size CB is 25A, not 30 A. Please correct. 2. Heater circuits 16 and 18 need to read "part of cir. 14", not part of circuit 8. Please correct. 3. Keynote 7 on the Single Line Diagram is confusing. Starting from the bottom of the Single Line Diagram, it is unclear where the 46 A comes from. The 30A from Panel ____ does not appear to come from anywhere either. The 67a going down to Panel _____ does not appear to come from any other reference, as it appears to be headed for Panel B, which is loaded to 103A. Same with the 50A and 126a designations above. Please simply provide load calculations for Panel A, rating of Panel A, and load calculations for the service. |
03/02/2004 | Patricia Gehlen | ZONING | REVIEW | Denied | Zoning 3/2/2004 Comments from the last submittal have not been addressed. An approved site plan is required prior to building plan review and approval |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/12/2004 | DELMA ROBEY | OUT TO CUSTOMER | Completed |