Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-COMMERCIAL TI
Permit Number - T03CM05277
Review Name: 3RD PARTY REVIEW-COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/26/2003 | EROSE1 | WWM | REVIEW | Needs Review | |
| 11/26/2003 | GP | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | ARCHITECTURAL COMMENTS General 1. Provide architectural detail for refrigerant penetrations through roof as referenced on Sheet M2. PLUMBING COMMENTS Sheet P1 1. Coordinate fixture demolition and relocation with Pima County Wastewater Management for additional assistance call 740-6500. Advisory comment only. No response required. MECHANICAL COMMENTS General 1. Coordinate smoke detection systems control with the electrical drawings. Ref. IMC 606. Sheet M2 1. The note on this sheet references the architectural drawings for refrigerant line roof penetrations. This detail is not found in the architectural drawings. Please coordinate this construction detail as noted. ELECTRICAL COMMENTS General 1. Coordinate smoke detection systems control. Ref. IMC 606. Sheet E1 1. Circuit "BA" 20 is used twice. Clarify. 2. Circuits "BA" 8 and "BA" 24 shown as lighting in the panel schedule, do not appear to have been used. Please clarify. Sheet E2 1. Circuits 31 and 33 on panel BA are shown on the plan as power to rooms 113, 118 and 119. The panel schedule identifies these circuits as spares. Please revise. 2. Power for room 116 appears to be served by "BA #15" but has not been shown on the plan. Please clarify. ENERGY COMMENTS - The energy portion has been reviewed and approved |
| 11/26/2003 | EROSE1 | WATER | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 11/26/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |