Permit Review Detail
Review Status: Completed
Review Details: PLANS OK TO SUBMIT - 3RD PARTY
Permit Number - T03CM05254
Review Name: PLANS OK TO SUBMIT - 3RD PARTY
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/07/2003 | DAN CASTRO | ZONING | REVIEW | Approved | |
| 11/07/2003 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise water pressure calculations to provide a minimum residual pressure of 15 PSI. Modify pipe sizing as required by revised calculations, including all branch pipes. Reference Section 608.1, UPC 1994. 2. Revise the fixture units for the sink to 4 units for water and 3 units for waste. Reference Tables 6-3 and 7-3, UPC 1994. 3. Provide expansion tank for water heater. Reference Section 608.3, UPC 1994. 4. Show size, route, and termination of temperature and pressure relief for water heater. Reference Section 608.5, UPC 1994. |
| 11/07/2003 | MARTIN HAEBERLE | BUILDING-COMMERCIAL | REVIEW | Z_DO NOT USE | |
| 11/07/2003 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide calculations demonstrating adequate ventilation for the project areas. Reference Section 403.3, IMC 2000. 2. Provide information showing how the condensate drains were sized. Reference Section 307.2.2, IMC 2000. 3. Provide protection of all duct penetrations through floor/ceiling assemblies and fire-resistance-rated assemblies. Reference Section 302.2, IMC 2000. 4. Provide the weight of the proposed mechanical equipment. Reference Section 302.1, IMC 2000. 5. Provide structural calculations and details for the equipment platform. Reference Section 302.1, IMC 2000. |
| 11/07/2003 | JIM EGAN | FIRE | REVIEW | Z_DO NOT USE | |
| 11/07/2003 | BLANCA ESPINO | ENGINEERING | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 11/07/2003 | LISA LESNY | OUT TO CUSTOMER | Completed |