Permit Review Detail
Review Status: Completed
Review Details: SITE
Permit Number - T03CM05240
Review Name: SITE
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/21/2003 | Blanca Espino | ENGINEERING | REVIEW | Denied | DATE: November 25, 2003 ACTIVITY NUMBER: T03CM05240 PROJECT NAME: Warehouse Bldg. on 6th Ave. PROJECT ADDRESS: 2251 N. 6th Ave. PROJECT REVIEWER: Blanca Espino, Engineering Associate Resubmittal Required: Site Plan The following items must be revised or added to the plan. Please include a response letter with the next submittal that states how all comments have been addressed. Site Plan 1. Indicate property description. D.S. 2-02.2.1.A.2 2. Indicate project address. D.S. 2-02.2.1.A.3 3. Indicate proposed buildings roof slope, downspouts and sidewalk scuppers.. Indicate a dimension detail of downspout and scuppers. D.S. 2-02.2.1.A.6 4. If applicable, indicate location, type, size and height of existing and proposed signage. D.S. 2-02.2.1.A.13 5. Place a note on the plan, "See Grading Plan T03BU02850 Sheet C2.1 for elevation data, cut and fill quantites, drainage patterns, FFE, Basis of Elevation, and Basis of Bearing." D.S. 2-02.2.1.A.16,17,23 6. Indicate if streets are Public or Private. D.S. 2-02.2.1.A.18 7. Dimensioned right-of-way, including any applicable Major Streets and Routes (MS&R) Plan right-of-way. D.S. 2-02.2.1.A.19 8. All easements of record must be graphically shown on the plan together with recording docket and page reference. D.S. 2-02.2.1.A.20 9. A container service area must have an inside clear dimension of ten (10) feet by ten (10) feet. The plan shows a ten foot outside dimension. Steel pipes are required between the container and the enclosures rear and side walls. D.S. 6-01.4.2.C 10. Curb returns are required on all ingress/egress from an MS&R street. Because 6th is an MS&R show curb returns. Minimum radius is 25 ft. Transportation Access Management Guidelines, p. 21,22 |
12/01/2003 | Joseph Linville | LANDSCAPE | REVIEW | Denied | 1) City Engineer approval is required in order to locate up to 5' of the required street landscape border within the public in writing. Include written verification of any approvals received with future submittals. 2) Page 94 of the Stormwater Detention/Retention Manual list Lleucophyllum as a species which should be avoided within the flood zone. Revise the basin planting plan to include a species more compatible with periodic inundation. DS 10-01.0 3) Per DS 10-01.4.3.1 basins three feet and greater are to have slopes no steeper that 4:1. Revise the plans as necessary. 4) Sheets C1.1, C.2.1, and L1.1 do not match regarding the location of the loading zone. Revise as necessary. 5) A native plant preservation plan is required. LUC 3.8 |
12/03/2003 | JOE LINVILLE | NPPO | REVIEW | Denied | A native plant preservation plan is required. LUC 3.8 Plans will not be accepted for review without the required plans. |
12/05/2003 | MICHAEL ST. PAUL | ZONING | REVIEW | Denied | SITE PLAN TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Michael St.Paul FOR: Patricia Gehlen Planning Technician Principal Planner PROJECT: T03CM05240 Warehouse 2251 North 6th Avenue TRANSMITTAL: December 5, 2003 DUE DATE: December 3, 2003 COMMENTS: Please attach a response letter with the next submittal, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. CODE SECTION/ DEVELOPMENT STANDARD 1. Please provide the legal description of the property and the address for this project on the site plan. DS 2-02.2.1.2 DS 2-02.2.1.3 2. Please provide the dimension from the front of the building to the property along Sixth Avenue at the shortest point. DS 2-02.2.1.6 3. The proposed parking calculations are for the Industrial Use Group. None of those uses are allowed within the C-2 zone. Clearly and correctly identify an appropriate proposed use, or use group, for this zone. Provide correct vehicle and bicycle calculations for the identified use. DS 2-02.2.1.8 DS 2-02.2.1.9 DS 2-02.2.1.31 DS2-02.2.2.4 4. A pedestrian refuge is required between the building and the parking area access lane (PAAL) along the west (rear) side of the building. This pedestrian refuge must be connected to and integrated with the pedestrian circulation for the site. DS 2-02.2.1.12 DS 2-08.4.1.B DS 2-08.3.1 5. Please provide the location, type, size and height of any proposed signage. DS 2-02.2.1.13 6. Please graphically depict all easements of record on the site plan with docket and page recording information. DS 2-02.2.1.20 7. Please graphically depict any proposed lighting type and layout. DS 2-02.2.1.25 8. Please note that any and all changes made to this Site Plan must also be made to the Landscape Plan, the Grading Plan and any additional sheet developed for this project. 9. All billboards must be removed prior to the issuance of any C of Os for this property. 10. Landscaping in the right-of-way requires specific approval from the City Engineer. 11. Please more clearly depict the plans for the vacated area, and provide the anticipated date of acquisition. 12. The number handicapped accessible parking until the use and related parking issues have been addressed. If you have any questions about this transmittal, please call Michael St.Paul, (520) 791-5608 x1184. |
12/05/2003 | MICHAEL ST. PAUL | HANDICAP-SITE | REVIEW | Denied | See zoning comments. |
12/08/2003 | JIM EGAN | FIRE | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/09/2003 | TAMI ACHONG | OUT TO CUSTOMER | Completed |
12/08/2003 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |