Permit Number: T03CM05181
Parcel: 13419042C

Review Status: Completed

Review Details: 3RD PARTY REVIEW-COMMERCIAL TI

Permit Number - T03CM05181
Review Name: 3RD PARTY REVIEW-COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/31/2003 ROBERT SHERRY WATER REVIEW Approved
11/19/2003 EROSE1 ENGINEERING REVIEW Needs Review
11/19/2003 STANTEC 3RD PARTY REVIEW-COMMERCIAL REVIEW Denied SCOPE OF REVIEW:

The scope of this review covers Architectural, Structural, Plumbing, Mechanical and Electrical. All features were checked only to the extent allowed by the submittal provided. All portions of the project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval.

GENERAL:

q There are no general comments to be addressed.

ARCHITECTURAL:

q There are no architectural comments to be addressed.

STRUCTURAL:

q Page 7 of the structural calculations indicates that the angle lintel is to be 5/16" thick, while the schedule on Sheet S1.3 indicates a 3/16" thick lintel. Please coordinate.

MECHANICAL:

q There are no mechanical comments to be addressed.

PLUMBING:

q There are no plumbing comments to be addressed.

ELECTRICAL:

q There are two submersible pumps indicated on the plumbing drawings for the loading docks. Are the conduit runs for these pumps going to be completely above ground and capable of being installed after all concrete is poured? If not, then please provide information on the undergrounds required at this phase of construction.

-End of Review-
11/19/2003 ELAINE ROSE ZONING REVIEW Needs Review
11/19/2003 EROSE1 WWM REVIEW Needs Review
11/19/2003 EROSE1 FIRE REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
11/19/2003 ELAINE ROSE OUT TO CUSTOMER Completed