Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T03CM05148
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/06/2004 | GERRY KOZIOL | WWM | REVIEW | Denied | DEQ needs perc and design by civil engineer. |
| 01/14/2004 | TERRY STEVENS | BUILDING-RESIDENTIAL | REVIEW | Denied | PLAN CHECK COMMENTS - PROJECT #T03CM05148 01/13/04--------2ND REVIEW PLAN REVIEW FOR THE ABOVE REFERENCED STRUCTURE HAS BEEN COMPLETED. THIS LETTER REFLECTS COMMENTS TO BE ADDRESSED. IN ORDER TO FACILITATE A SHORTER BACK CHECK TIME, WE REQUEST THAT YOU PLEASE PROVIDE REVISED PLANS AND CALCULATIONS, HIGHLIGHTING ANY CHANGES, ALONG WITH A WRITTEN RESPONSE TO EACH OF THE NOTED ITEMS INDICATING ACTION TAKEN. GENERAL REQUIREMENTS: 1. ALL CORRECTIONS AND REVISIONS SHALL BE MADE ON THE ORIGINAL TRACINGS AND TWO NEW SETS OF PRINTS OR (1) SEPIA & (1) BLUE LINE SHALL BE RETURNED ALONG WITH ALL REDLINE PRINTS. 2. PEN OR PENCIL CORRECTIONS ON FINAL PRINTS WILL NOT BE ACCEPTABLE. TO AVOID DELAYS ENSURE ALL CORRECTIONS HAVE BEEN MADE, ARE COMPLETE AND HAVE BEEN COORDINATED ON ALL APPLICABLE DETAILS AND NOTES. NOTE: TAPED ON CORRECTIONS TO PLANS ARE NOT ALLOWED--------RUN A COPY. SITE PLAN: 1. NEW SITE PLAN SUBMITTED MUST BE APPROVED BY ZONING AND FLOODPLAIN. STRUCTURAL PLANS: 1. DETAIL 2/A1-------BEAM MUST HAVE FULL 11/2" BEARING ON POST, AS DRAWN THE VALUE OF ONE BEAM IS CUT IN HALF. 2. DETAIL 1/A1--------AN AB POST BASE HAS NO UPLIFT VALUES-------AN ABA46 WOULD WORK. 3. INSULATION CANNOT BE UP AGAINST THE ROOF DECK WHEN USING SHINGLES, AS INDICATED ON DETAILS AND CROSS SECTIONS. CHANGE ALL NOTES AND DETAILS. IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT YOUR ASSIGNED PLANS EXAMINER: TERRY STEVENS @ 791-5550 EXT. 1112 |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/16/2004 | DELMA ROBEY | OUT TO CUSTOMER | Completed |