Review Status: Completed
Review Details: RESUBMITTAL - SITE
Permit Number - T03CM05103
Review Name: RESUBMITTAL - SITE
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/24/2004 | Jim Egan | FIRE | REVIEW | Approved | |
| 03/30/2004 | BLANCA ESPINO | ENGINEERING | REVIEW | Denied | Site Plan 1. As per John Clark's letter of recommendation for design is acceptable. A DSMR is required due to design proposal cannot meet Development Standards 6-01.0 & D.S. 6-01.4.1.I |
| 04/15/2004 | Daniel Castro | ZONING | REVIEW | Denied | COMMENTS: Please attach a response letter with the next submittal, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. CODE SECTION/ DEVELOPMENT STANDARD 1. Note the new legal description of the property on sheet C1.1. The resubmittal package includes the receipt of recording for the 4.5' land acquisition from the City (DKT 12279 Page 442). The legal description for Lot A must be recorded and proof of recordation provided. Lots B and C must be combined by a new metes and bounds legal description and proof of recordation provided. The new legal description should encompass both lots B and C. (D.S. 2-02.2.1.A.2) 2. Since the lots have been reconfigured, please label and dimension the existing building on the adjacent property to the west. Note the square footage and building height. In addition, label and fully dimension the vehicle parking spaces and PAAL's to remain. 3. Engineering Section comment number two (2) dated March 30, 2004 requires a DSMR for this project. If a DSMR is applied for, add a general note which states the DSMR case number, date of approval, modifications granted, and any conditions imposed. 4. Review of this plan by the Zoning Review Section may be done over the counter. Please contact Dan Castro to set an appointment. If you have any questions about this transmittal, please call Dan Castro, (520) 791-5608. |
| 04/16/2004 | JOE LINVILLE | NPPO | REVIEW | Approved | exception. |
| 04/16/2004 | DAN CASTRO | HANDICAP-SITE | REVIEW | Approved | |
| 04/16/2004 | Joseph Linville | LANDSCAPE | REVIEW | Denied | Refuse containers are to be placed so that the collection vehicle does not have to back into moving traffic, on or off the premises. DS 6-01.4.1.I |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/20/2004 | TAMI ACHONG | OUT TO CUSTOMER | Completed |
| 04/19/2004 | SUE REEVES | REJECT SHELF | Completed |