Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T03CM05054
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/23/2003 | JIM EGAN | FIRE | REVIEW | Approved | |
10/23/2003 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide cleanouts at P-3, P-4, P-2, and P-1. Reference Sections 707.4, and 707.11, UPC 1994. 2. Provide calculations to show how the water piping was sized. Reference Section 610.1, UPC 1994. 3. Show gas piping system with sizing calculations. Reference Section 1217.1, UPC 1994. |
10/23/2003 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Denied | |
10/23/2003 | ROBERT SHERRY | WATER | REVIEW | Approved | |
10/23/2003 | PATRICIA GEHLEN | ZONING | REVIEW | Approved | |
10/23/2003 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide calculations to show that the outside air supplied to the space meets the requirements of Section 403, IMC 2000. 2. Indicate the CFM being exhausted by the existing restroom exhaust fan meets the requirements of Section 403.2.1(3), IMC 2000. 3. Show size, route, and termination of condensate drain from new rooftop unit. Reference Section 307.2, IMC 2000 with local amendments. |
10/23/2003 | BLANCA ESPINO | ENGINEERING | REVIEW | Approved | |
12/03/2003 | MVALDEZ1 | WWM | REVIEW | Needs Review | |
12/03/2003 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved | T03CM05054 DENIED 10/30/03 1. Provide power for RTU-1. Coordinate with Sheet M3.1. 2. RTU-2 is 460V on Sheet M3.1, and is powered at 208V on Panel A. Please clarify. 3. RTU-2 MOCP 50 on Sheet M3.1, but is protected by a 25A CB on Panel A. Verify that this will allow the unit to start. 4. Circuits A-11 and A-9 appear to be mixed on the lighting plan. 5. Please double check calculations on Lighting Circuits A-3, A-11, A-9, and A-7. It appears either that they were not calculated at 125% for continuous load, or that they were just computed at watts as opposed to volt-amperes. 6. Load calculation for Panel A needs to show total amperage loading. 7. Provide the conductor sizing for the existing feeder to Panel A. Linda Buczynski 520.791.5550 x1106 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/03/2003 | MONICA VALDEZ | OUT TO CUSTOMER | Completed |
12/03/2003 | MONICA VALDEZ | REJECT SHELF | Completed |