Permit Review Detail
Review Status: Stopped
Review Details: COMMERCIAL TI
Permit Number - T03CM05020
Review Name: COMMERCIAL TI
Review Status: Stopped
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/22/2003 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 10/28/2003 | Robert Sherry | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide combustion air in compliance with sections 507.2 and 507.6, State of Arizona amendments to UPC 1994. 2. Confirm the scale of the Waste/Gas Plan, P1.1 and the Water Plan, P2.1. Reference Section 103.2.2, UPC 1994. 3. Provide upper terminal cleanouts for the 3" waste pipes originating in restrooms 101 and 104. Reference Section 707.4, UPC 1994. 4. Coordinate the waste plan and the waste isometric to show the same system. Revise the line weight of the vent piping shown on the waste isometric to be legible. Reference Section 103.2.2, UPC 1994. 5. Show the connection of the shower (S-1) to the waste piping system. Reference Section 103.2.2, UPC 1994. 6. Clarify the fuel to be used for the unit heaters. Note #10, P1.1, implies natural gas but a note on Waste/Gas Plan indicates propane. Reference Section 103.2.2, UPC 1994. 7. Provide calculations to support the sizing of the LPG piping. Reference Section 1217.3, UPC 1994. 8. Show the proposed location of the LPG storage tank on the site plan, complete with routes of access and supply piping. Reference Section 1213.1, UPC 1994. 9. Show location of the main shut off valve for the LPG piping on the plans. Reference Section 1213.3, UPC 1994. 10. Indicate the installed height of the LPG piping on the plans. Reference Section 103.2.2, UPC 1994. 11. Provide calculations to support the sizing of the water supply pipes. Include the existing plumbing fixtures and the HVAC supplies when determining the building demand and confirming the size of the main supply pipe and meter size. Indicate the size of the existing water meter and main supply piping on the site plan. Reference Section 610.0, UPC 1994. 12. If the specified water heater is not supplied with integral heat traps, provide heat traps on the supply and discharge piping along with ½" insulation on the first eight feet of supply and discharge piping. Reference Section 704.4, IECC 1998. |
| 10/28/2003 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 10/28/2003 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide calculations demonstrating adequate ventilation for Room 100 during periods when the evaporative coolers are not in use. Reference Section 401, IMC 2000. 2. Provide calculations demonstrating adequate ventilation for Room 102. Reference Section 401, IMC 2000. 3. Provide construction details for evaporative cooler support and concrete pad. Reference Section 106.3.1, IMC 2000. 4. Show the relationship of the exhaust for Restroom 104 to the window. Reference Section 401.6, IMC 2000. 5. Provide mounting height for louvers in east wall. Reference Section 106.3.1, IMC 2000. 6. Show how the ventilation provided by the evaporative coolers (total of 24,000 CFM) and the relief provided by the louvers (total of 4,660 CFM) complies with Section 403.1, IMC 2000. |
| 11/13/2003 | PATRICIA GEHLEN | ZONING | REVIEW | Denied | Zoning 11/13/2003 Building plans may not be reviewed and approved until copies of the stamped approved development and landscape plans are included in the submittal package. |
| 11/14/2003 | Linda Buczynski | ELECTRICAL-COMMERCIAL | REVIEW | Denied | DENIED 11/14/03 T03CM05020 1. Sheet E1 indicates the addition of Fixtures F & G to existing Circuit A-10. Such circuit is feeding evidently 3-phase. Please clarify, and revise load calculations as necessary. If such is the case, suggest the new lights be added to Phase C, the most lightly loaded. 2. On the Power Plan, please revise the wording "B-20" to read "B-22", to coordinate with the Panel Schedule. 3. On Panel Schedules, provide 3-pole CBs for the Master Cool units. Schedules have them on single pole CBs. LAB 791.5550 x1106 |
| 11/14/2003 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Denied | City of Tucson, Development Services BUILDING AND STRUCTURAL COMMENTS 1) Provide structural details of structure along with engieering calc`s. 2) Foundation -How or where were the values for the reactions obtained? 3) Provide the required dimensions in the physically disabled bathrooms as As per chapter 11 of the 2000 I B C. 4) Provide a detail of the 1- HR.wall adjacent to the property line. 5) Provide a detail showing how the 2x12 `s are being hung or attached.(SEE BUILDING SECT.) 6) Provide a guard rail around the pit as per section 1003.2.12 of the IBC 2000. 7) What is the distance between the wall and east property line? Show on plans. |
| 11/17/2003 | Paul Machado | ENGINEERING | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/31/2003 | ANGIE SHOFFSTALL | REJECT SHELF | Stop |
| 10/21/2003 | ANY | OUT TO CUSTOMER | Stopped |