Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-RESIDENTIAL
Permit Number - T03CM04917
Review Name: 3RD PARTY REVIEW-RESIDENTIAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/11/2003 | STANTEC | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | SCOPE OF REVIEW: The scope of this review covers Architectural, Structural, Plumbing, Mechanical, Model Energy and Electrical codes. All code references are to the 2000 International Residential Code (IRC) except for plumbing, which is to the 1994 Arizona Uniform Plumbing Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. GENERAL REQUIREMENTS: q There are no general comments to be addressed. ARCHITECTURAL: q Label all rooms and spaces shown on the floor plan on Sheet A2. q Note that bathtub and shower enclosures shall be finished [2000 IRC Sec. P2710] with ceramic tile [2000 IRC Sec. R702.4], or a listed enclosure, to a height of 72" above the drain [2000 IRC Sec. R307.2]. q Show that each water closet is located in a clear space not less than 30" wide and has a clear space in front of not less than 21" [2000 IRC Fig. R307.2]. q Detail and specify stair width (minimum 36"), rise and run (minimum 10" tread depth and 7-3/4" maximum riser height), landing width (a landing is required), and handrail heights (only required if 2 or more risers) [2000 IRC Sec. R312 through R316]. STRUCTURAL: q Please clarify the construction involved with steel lintel SL1 (indicated on Sheet A3). Is the lintel anchored to the construction? How much bearing area is required on the lintel? Is the angle welded to the 1/4" plate? q Provide special inspection certificate for epoxy anchors [2000 IBC Chapter 17]. q What size is the steel shown in the footing of Detail 4 on Sheet A3? Is the concrete stem wall reinforced? Grouted? Also, is it steel in the footing continuous? Please clarify. PLUMBING PLANS: q Provide a gas line diagram (isometric or plan view) with the length of line to each appliance, BTU demand of each appliance, size of each branch, total demand and size of the main line from the meter [1994 AzUPC Chapter 12]. q Showers and tub-shower combinations shall be provided with individual control valves of the pressure balance type or of the thermostatic mixing valve type [1994 AzUPC Sec. 410.7]. MECHANICAL PLANS: q The upper opening in the mechanical room door does not comply with the combustion air requirements of the code. The upper opening needs to be within 12" of the room's ceiling [2000 IRC Sec. M1703.2]. ELECTRICAL PLANS: q Receptacles shall be installed so that no point along a wall space in no more than 6 feet measured horizontally from an outlet in that space [2000 IBC Sec. R3801.2.1]. Any wall space that is 2 feet long or more requires at least one receptacle [2000 IRC Sec. R3801.2.2]. Specifically check both bedrooms and the wall behind the front door. q Hallways of 10 feet or more in length shall have at least one receptacle [2000 IBC Sec. E3801.10]. q Provide an exterior outlet at grade level located at both the front and back of the dwelling [2000 IRC Sec. E3801.7]. These outlets shall be GFI protected [2000 IRC Sec. E3802.3]. There is an outlet at the back, but not at the front. q A receptacle outlet shall be provided adjacent to the basin in each bathroom [2000 IRC Sec. E3801.6]. Bathroom outlets shall be on a separate 20-amp circuit with no other outlets [2000 IRC Sec. E3603.4]. Check the new bathroom outlet. q Note that two or more 20-amp small appliance circuits shall be provided to serve all receptacle outlets in the kitchen, breakfast room and dining room. Such circuits shall have no other outlets [2000 IRC Sec. E3603.2 and E3801]. The dining room (maybe, don't know, not labeled) needs to have the receptacles on a separate circuit from the lights. ENERGY: q There are no energy comments to be addressed. -End of Review- |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/12/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |