Permit Number: T03CM04862
Parcel: 113080100

Review Status: Completed

Review Details: OTHER

Permit Number - T03CM04862
Review Name: OTHER
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/14/2003 GERRY KOZIOL WWM REVIEW Approved
10/21/2003 Robert Sherry PLUMBING-COMMERCIAL REVIEW Denied 1. Provide cut sheets for the specified water closet and the existing water closet in the adjoining space, showing the required minimum water pressure is less than 15 psig. Reference Section 608.1, UPC 1994.
2. Calculate the water demand using the fixture units shown in Tables 6-3 or A-2. Reference Section 610.3, UPC 1994.
3. Calculate the size of the waste water pipes using the fixture units shown in Table 7-3. Reference Section 702.0, UPC 1994.
4. Include the pressure drop from existing water sub-meter and the lift to the evaporative coolers in the water calculations. Resize pipe as required. Reference Sections 610.2 and A3.3, UPC 1994.
5. Limit water velocity to 8 FPS for copper. Resize pipe as required. Reference Section A6.1, UPC 1994 and Section 610.0, IAPMO IS 3-93.
6. Riser diagram 1A is not approved. Reference Section 901.0, UPC 1994.
7. Provide vents for all plumbing traps shown in riser diagram 1/P-1. Reference Section 901.0, UPC 1994.
8. Provide cleanout for sink shown in riser diagram 1/P-1. Reference Section 707.4 (1), UPC 1994.
9. Provide an approved receptor for the washing machines located near Bulkhead #1. Reference the letter from Dave Mann, dated 8/12/02.
10. Coordinate riser diagram 4/P-1 with the plumbing plan. Reference Section 103.2.3, UPC 1994.
11. Modify the 2-way cleanout shown on riser diagram 4/P-1 to allow the area between the two cleanouts to be snaked. Reference Section 707.4 (4), UPC 1994.
12. If the hot water recirculating pump is not installed, provide heat traps for both the cold water and hot water pipes for the water heater. Reference Section 704.4, IECC 1998.
13. Relocate the expansion tank (Detail 1/P-2) so that no shut off valve is located between the expansion tank and the water heater. Reference 608.3, UPC 1994.
14. Provide natural gas pipe sizing calculations. Include gas pressures and developed pipe lengths on plans. Include developed lengths for the existing gas pipes serving the adjacent tenant along with the pressure drop associated with the sub-meter. Reference Section 1217.0, UPC 1994 with AZ State amendments.
10/21/2003 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Provide make-up air for dryers. Reference Section 504.6, IMC 2000.
10/23/2003 DOUG LAAKSO BUILDING-COMMERCIAL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
10/23/2003 TAMI ACHONG OUT TO CUSTOMER Completed
10/23/2003 TAMI ACHONG REJECT SHELF Completed