Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T03CM04823
Parcel: 10701040A

Review Status: Completed

Review Details: 3RD PARTY REVIEW-COMMERCIAL

Permit Number - T03CM04823
Review Name: 3RD PARTY REVIEW-COMMERCIAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/10/2003 EROSE1 WWM REVIEW Needs Review
11/10/2003 EROSE1 ENGINEERING REVIEW Needs Review
11/10/2003 STANTEC 3RD PARTY REVIEW-COMMERCIAL REVIEW Denied SCOPE OF REVIEW:

The scope of this review covers Architectural, Structural, Plumbing, Mechanical and Electrical. All features were checked only to the extent allowed by the submittal provided. All portions of the project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval.

GENERAL:

q Provide site plan information. The following information needs to be presented at a bare minimum:
· Distance from the building to the property line and other structures on the property.
· The building's finished floor elevation and how this relates to the adjacent grades.
· Sewer information (pipe sizes, flow direction, cleanouts, rim elevation of manholes, etc.).
· Water service (water meters, backflow prevention, etc.)

ARCHITECTURAL:

q There are no architectural comments to be addressed.

STRUCTURAL:

q The special inspection certificates that have been provided need to have a signature from the owner or his/her legal representative.

q Page 44 of the structural calculations indicates that the plywood roof diaphragm is to be nailed at 6" o.c. The Roofing Plan Keyed Note 1 on Sheet S3.1 indicates to see the general structural notes for attachment of the roof diaphragm. The general structural notes on Sheet S1.1 indicate the nailing of the roof diaphragm is to be 12" o.c. Please clarify.

MECHANICAL:

q There are no mechanical comments to be addressed.

PLUMBING:

q There are no plumbing comments to be addressed.

ELECTRICAL:

q There are no electrical comments to be addressed.

-End of Review-
11/10/2003 ELAINE ROSE ZONING REVIEW Needs Review
11/10/2003 EROSE1 WATER REVIEW Needs Review
11/10/2003 EROSE1 FIRE REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
11/10/2003 ELAINE ROSE OUT TO CUSTOMER Completed