Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-COMMERCIAL TI
Permit Number - T03CM04746
Review Name: 3RD PARTY REVIEW-COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/08/2003 | EROSE1 | WWM | REVIEW | Needs Review | |
10/08/2003 | GP | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | ARCHITECTURAL COMMENTS Sheet A1.0 1. Please complete the governing regulation block in the code analysis data. Include the 1998 ANSI A117.1 as the accessibility code, the LUC as the zoning code and the 1998 IECC as the energy code. All codes have local amendments. 2. Revise allowable area calculations for compliance with IBC 506 or indicate not applicable for the proposed 3,041 s.f. tenant improvement. 3. In the sheet index MP1.0 has been shown twice and the electrical sheet numbering does not correspond to the plan. Please revise. Sheet A2.0 1. Specify in general note 2 that the door schedule is shown on Sheet A3.0 2. Provide the window schedule referenced in general note 3. 3. The built in reception desk referenced in floor plan keynote 1is noncompliant with ANSI A117.1,903. See comments for detail 1/A4.0. 4. Floor plan keynote 2 refers to detail 1/A4.0 for the reception counter. Keynote 2 on the plan also refers to the breakroom counter. Detail the common use breakroom counter for compliance with ANSI A117.1,903. 5. Keynote 3 refers to existing glazing. This glazing, within 24" arc swing of door pair 100A, is required to be safety glazing. 6. Provide a detailed elevation and plan view at the toilet rooms demonstrating compliance with ANSI A117.1. 7. Revise floor plan keynote 5 to reference both rear and side grab bars. Detail compliance with ANSI A117.1,604 in the elevation details required as response to comment 6. 8. Show keynote 6 as it occurs on the plan. 9. The new wall adjacent to the existing storefront door in room 102 encroaches on maneuverability clearance. Ref. ANSI A117.1,404. 10. Keynote 8, for full height metal frame walls, is not shown on the floor plan. Show where this occurs on the floor plan or state that locations are shown on A2.1. 11. Please show the cabinets referenced in keynotes 10 and 11. 12. Keynote 16, noted as unused, is shown on the plan at the copy area. Please clarify. 13. Keynote 18, for signage, is not shown on the plan. The reference should be to ANSI A117.1,703. Please show drinking fountain. Ref. IBC 2902.1. Sheet A2.1 1. Please show on the plan where existing fire resistive demising walls occur. Sheet A3.0 1. Provide construction dimensions for the continuous transom window condition at room 111. 2. Specify interior finish specifications for rooms 114 and 115 complying with IBC 1209. 3. Describe COFB floor/base in the room finish schedule. 4. No hardware information has been provided. Door set 100A must be readily openable from the egress side without the use of a key or special knowledge or effort. Ref. IBC 1003.3.1.8. Note this in the door schedule. 5. Exhaust fans EF-1 through EF-4 are not shown in the RCP. Please clarify Sheet A4.0 1. Dimension the portion of the reception counter compliant with ANSI A117.1,903. Sheet A5.0 1. Dimension the maximum slope of 50% at threshold detail 7/A5.0. Ref. IBC 1003.3.1.6. STRUCTURAL COMMENTS Sheet A2.1 1. Complete the wall details with specifications for connections at the top and bottom of the wall. Ref. IBC 1607.13. PLUMBING COMMENTS - The plumbing portion has been reviewed and approved. MECHANICAL COMMENTS - The mechanical portion has been reviewed and approved. ELECTRICAL COMMENTS Sheet E0 1. The one line diagram shows a new panel identified as "P2". It appears this should be panel "M1". Please clarify. 2. Please provide the interior lighting power calculations. Ref. IECC Table 705.4. ENERGY COMMENTS General 1. See electrical comment 2. |
10/08/2003 | EROSE1 | WATER | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/08/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |