Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T03CM04671
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/27/2004 | BLANCA ESPINO | ENGINEERING | REVIEW | Approved | |
| 02/02/2004 | PATRICIA GEHLEN | ZONING | REVIEW | Denied | Zoning 2/2/2004 Zoning may not review and approve building plans until the site plan is approved and included in the building plan submittal. |
| 02/02/2004 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Show the size, route, and termination of the condensate drain for AC-1. |
| 02/02/2004 | Robert Sherry | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide water sizing calculations using Table 6-4, UPC 1994. Include the information required in Section 610.7, UPC 1994. Table 6-4 includes a minimum residual pressure of 15 PSI but additional head losses (such as the water meter, reduced pressure backflow preventer, static lift (Section 610.7(3), UPC 1994), or additional residual pressure required by the specified fixtures) must be subtracted from the available water pressure to determine which of the 3 tables is to be used. Reference Section 610.4, UPC 1994. 2. Size the hot water piping per Sections 610.12 or 610.13, UPC 1994. 3. If natural gas not to be supplied to the building, remove the gas piping from Detail 4/PME. |
| 02/03/2004 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 03/02/2004 | BOB SUBA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | 1.indicate disconnect at w.heater 2.provide conductor size for w.heater 3. provide individual circuit loads at panel schedule. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/01/2004 | LISA LESNY | OUT TO CUSTOMER | Completed |
| 03/01/2004 | TAMI ACHONG | REJECT SHELF | Completed |