Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T03CM04671
Review Name: COMMERCIAL NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/01/2003 | JIM EGAN | FIRE | REVIEW | Approved | |
| 10/01/2003 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 10/08/2003 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Denied | City of Tucson, Development Services BUILDING AND STRUCTURAL COMMENTS 1) Regarding headers at porch, where do you find the beams shown on yourcalcs? they are not found in the 2001 edition of the NDS.(design values for wood const- ruction.)TABLE 1B. Specify the referance being used. |
| 10/13/2003 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide water sizing calculations using Table 6-4, UPC 1994. Reference Section 610.4, UPC 1994. 2. The minimum required water pressure for the specified water closet is 20 PSI, not 8 PSI. 3. Use the fixture unit values shown in Table 6-3, UPC 1994 for water calculations. Reference Section 610.3, UPC 1994. 4. Show sizes for all of the pipe sections on the Supply Schematic. 5. Show size, routing, and termination of temperature/pressure relief piping from water heater. Reference Section 608.5, UPC 1994. 6. Show location and arrangement for the specified expansion tank for the water heater. Reference Section 608.3, UPC 1994. 7. Provide cleanout for sink. Reference Section 707.4, UPC 1994. 8. Clarify the reason for supplying natural gas to the building. 9. If a reduced pressure backflow preventer assembly is required for this project, show it's size and location on the site plans. |
| 10/13/2003 | Robert Sherry | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the energy code compliance calculations to show compliance with the current code. Reference Section 101.2, International Energy Conservation Code 1998. 2. Revise the supply and/or the exhaust flow rates in the two restrooms to comply with Section 403.2.1(3), IMC 2000. 3. Provide rim elevation of next upstream sanitary manhole. Determine need for backwater valve per Section 710.1, UPC 1994. 4. Provide operating weight of AC-1. |
| 10/13/2003 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 10/24/2003 | BOB SUBA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | 1. Properly calculate your loads (this is considered commercial not residential). 2.Provide the load for each circuit used. 3.Install-indicate a disconnecting means at w.heater location. 4.Indicate the conductor sizing for the water heater circuit. 5.Indicate the lamp type for the outdoor fixture " C " ( I need to verify it's compiance with the outdoor lighting ordinance). |
| 10/27/2003 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | Site Plan approval required prior to building approval |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/29/2003 | DELMA ROBEY | OUT TO CUSTOMER | Completed |