Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-RESIDENTIAL
Permit Number - T03CM04584
Review Name: 3RD PARTY REVIEW-RESIDENTIAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/02/2003 | GP | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | ARCHITECTURAL COMMENTS Sheet A2.0 1. Please show landings at exterior doors. Ref. R313. 2. Specify vertical members at column footings CF number 1 through number 4. Sheet A3.0 1. Show column members coordinate with CF number 1 through number 4. Sheet A4.0 1. Show handrail at the stairs. 2. Show the locations where one hour dwelling unit separation occurs. Provide the item number from IBC 719.1(2) or the listing number from an approved testing agency for the assembly. 3. Coordinate opening protective requirements at the dwelling unit separation conditions. 4. Specify protection of penetrations at the dwelling unit separation conditions. 5. Provide details for the site built fireplace. Ref. R1001. 6. Specify door types at the master bedroom and living room. 7. Safety glazing is required for the double french doors adjacent to bedroom 3. Sheet A6.0 1. Specify the listing number for the stucco system weep screeds. STRUCTURAL COMMENTS Sheet A3.0 1. Coordinate horizontal framing with rooftop mechanical equipment load.. PLUMBING COMMENTS Sheet P1 1. Show the required cleanouts. Ref. UPC 707.4. 2. Show the gas line sizes. Ref. UPC 1217. 3. Provide a fullway valve for the supply service. Ref. UPC 605.3. 4. Provide a pressure and temperature relief. Ref. UPC 608. MECHANICAL COMMENTS Sheet M1 1. Show path and termination of exhaust vents. 2. Show the size of the exhaust relief openings. 3. Show the path and termination of the dryer vent. ELECTRICAL COMMENTS Sheet E1 1. Show circuit information on plan 2. Show subpanel location. 3. Revise code reference for grounding and bonding. Ref. IECC 3508, 3509. ENERGY COMMENTS - The energy portion has been reviewed and approved. |
| 10/07/2003 | ELAINE ROSE | ZONING | REVIEW | Needs Review | |
| 10/07/2003 | EROSE1 | WWM | REVIEW | Needs Review | |
| 10/07/2003 | EROSE1 | ENGINEERING | REVIEW | Needs Review | |
| 10/07/2003 | EROSE1 | NPPO | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/02/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |