Permit Number: T03CM04418
Parcel: 12416005A

Address:
1440 S EUCLID AV

Review Status: Completed

Review Details: SITE

Permit Number - T03CM04418
Review Name: SITE
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/10/2003 JIM EGAN FIRE REVIEW Approved
10/03/2003 LOREN MAKUS SANITATION REVIEW Denied DATE: October 3, 2003
TO: Mr. Steve Shields, Intertech
SUBJECT: Connelly Billiard Covered Parking
REVIEWER: Loren Makus
ACTIVITY NUMBER: T03CM04418

SUMMARY: The Site Plan was reviewed by Development Services Department, Engineering Division on October 3, 2003. The site plan was not approved. Please address the following comments.

Site Plan Comments:
1) Show the refuse container location, access and size. (Development Standard (DS) 2-02.2.1.A.6)
2) The site plan must show proposed and existing structures including height, overhang and canopies. (DS 2-02.2.1.A.6) Revise the site plan to show the clear height under the covered parking canopy. If the PAAL under the canopy is required for Solid Waste vehicle access, show that the required clearance is provided as described in DS 6-01.
3) Show sight visibility triangles for access to 24th Street and Euclid Avenue. (Development Standard (DS) 2-02.2.1.A.10)

Revise the Site Plan to address all of these comments and resubmit two copies for review. Include a letter explaining how each comment has been addressed. When the site plan is approved, submit application for a grading permit, if it is determined to be necessary.


Loren Makus
Senior Engineering Associate
Engineering Division
Development Services
10/03/2003 LOREN MAKUS ENGINEERING REVIEW Denied DATE:October 3, 2003
TO: Mr. Steve Shields, Intertech
SUBJECT: Connelly Billiard Covered Parking
REVIEWER: Loren Makus
ACTIVITY NUMBER: T03CM04418

SUMMARY: The Site Plan was reviewed by Development Services Department, Engineering Division on October 3, 2003. The site plan was not approved. Please address the following comments.

Site Plan Comments:
1) Show the refuse container location, access and size. (Development Standard (DS) 2-02.2.1.A.6)
2) The site plan must show proposed and existing structures including height, overhang and canopies. (DS 2-02.2.1.A.6) Revise the site plan to show the clear height under the covered parking canopy. If the PAAL under the canopy is required for Solid Waste vehicle access, show that the required clearance is provided as described in DS 6-01.
3) Show sight visibility triangles for access to 24th Street and Euclid Avenue. (Development Standard (DS) 2-02.2.1.A.10)

Revise the Site Plan to address all of these comments and resubmit two copies for review. Include a letter explaining how each comment has been addressed. When the site plan is approved, submit application for a grading permit, if it is determined to be necessary.


Loren Makus
Senior Engineering Associate
Engineering Division
Development Services
10/06/2003 Joseph Linville LANDSCAPE REVIEW Denied Submit a copy of the previous site plan approved for zoning compliance and a landscape plan. The provisions of LUC 3.7 apply to any proposed expansions and changes to approved vehicular use areas. LUC 3.3.3.10, LUC 3.3.7.7.
10/07/2003 JOE LINVILLE NPPO REVIEW Approved Exception.
10/10/2003 MICHAEL ST. PAUL HANDICAP-SITE REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
10/14/2003 LISA LESNY OUT TO CUSTOMER Completed