Permit Number: T03CM04224
Parcel: 120082400

Address:
4626 S 6TH AV

Review Status: Completed

Review Details: COMMERCIAL NEW

Permit Number - T03CM04224
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/05/2003 ROBERT SHERRY WATER REVIEW Approved
09/05/2003 Robert Sherry MECHANICAL-COMMERCIAL REVIEW Passed
09/05/2003 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide up and downstream manhole rim elevations. Reference Section 710.1, UPC 1994.
2. Resolve the size of the building sewer: it is shown as 3" on sheets 1 and 2, but is shown as 4" on sheet 3.
3. Provide the slope of the building sewer. Reference Section 718.1, UPC 1994.
4. Provide water pressure and sizing calculation. Include any hose bibbs, HVAC connections, or irrigation outlets in the calculations. Reference Section 610.1, UPC 1994.
5. Provide the size of the reduced pressure backflow preventer. Reference Section 610.2, UPC 1994.
6. Provide a 2-way cleanout in the building sewer at the lower end of the building drain if an upper terminal cleanout is not provided. Reference Section 707.4, UPC 1994.
09/11/2003 RAUL PALMA BUILDING-COMMERCIAL REVIEW Approved
09/12/2003 MELISSA POULIN WWM REVIEW Approved
09/30/2003 LOREN MAKUS ENGINEERING REVIEW Denied The building plan cannot be approved until the site plan is approved.
10/01/2003 LOREN MAKUS ENGINEERING REVIEW Denied The building plan cannot be approved until the site plan is approved.
10/02/2003 Linda Buczynski ELECTRICAL-COMMERCIAL REVIEW Denied 1. Put Electrical Riser Diagram detail on plans.
2. On Elec. Riser Diagram, change "NEC 250-81,83" to "NEC 250-64,66". There is no NEC 250-81,83.
3. The two notes on the bottom of the Elec. Riser Diagram are unnecessary, and do not relate to NEC. There is no Table E 3503.1 in the NEC. There is no Chapter 35 or 36 in NEC.
10/13/2003 PATRICIA GEHLEN ZONING REVIEW Denied Zoning
10/13/2003
Building plans may not be reviewed and approved until site plan is approved

Final Status

Task End Date Reviewer's Name Type of Review Description
10/23/2003 DELMA ROBEY OUT TO CUSTOMER Completed