Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T03CM04224
Review Name: COMMERCIAL NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/05/2003 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 09/05/2003 | Robert Sherry | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
| 09/05/2003 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide up and downstream manhole rim elevations. Reference Section 710.1, UPC 1994. 2. Resolve the size of the building sewer: it is shown as 3" on sheets 1 and 2, but is shown as 4" on sheet 3. 3. Provide the slope of the building sewer. Reference Section 718.1, UPC 1994. 4. Provide water pressure and sizing calculation. Include any hose bibbs, HVAC connections, or irrigation outlets in the calculations. Reference Section 610.1, UPC 1994. 5. Provide the size of the reduced pressure backflow preventer. Reference Section 610.2, UPC 1994. 6. Provide a 2-way cleanout in the building sewer at the lower end of the building drain if an upper terminal cleanout is not provided. Reference Section 707.4, UPC 1994. |
| 09/11/2003 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 09/12/2003 | MELISSA POULIN | WWM | REVIEW | Approved | |
| 09/30/2003 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | The building plan cannot be approved until the site plan is approved. |
| 10/01/2003 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | The building plan cannot be approved until the site plan is approved. |
| 10/02/2003 | Linda Buczynski | ELECTRICAL-COMMERCIAL | REVIEW | Denied | 1. Put Electrical Riser Diagram detail on plans. 2. On Elec. Riser Diagram, change "NEC 250-81,83" to "NEC 250-64,66". There is no NEC 250-81,83. 3. The two notes on the bottom of the Elec. Riser Diagram are unnecessary, and do not relate to NEC. There is no Table E 3503.1 in the NEC. There is no Chapter 35 or 36 in NEC. |
| 10/13/2003 | PATRICIA GEHLEN | ZONING | REVIEW | Denied | Zoning 10/13/2003 Building plans may not be reviewed and approved until site plan is approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/23/2003 | DELMA ROBEY | OUT TO CUSTOMER | Completed |