Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-COMMERCIAL TI
Permit Number - T03CM04166
Review Name: 3RD PARTY REVIEW-COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/10/2003 | EROSE1 | WWM | REVIEW | Needs Review | |
09/10/2003 | GP | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | ARCHITECTURAL COMMENTS Sheet A1 1. Please specify the hardware of the doors at the exit discharge from corridors 105 and 128. Ref. IBC 1003.3.1.8. 2. Provide a note that door 100 will comply with the provisions of IBC 1003.1.8. 3. Please clarify how the requirement for the minimum number of plumbing facilities is met. Ref. IBC Table 2902.1. PLUMBING COMMENTS Sheet P.101 1. Please show the path of termination for the water heater P&T relief drain line. Ref. UPC 608.5. 2. The plan notes and detail show ½" DCW to HWH-3. The isometric shows ¾" DCW to HWH-3. Please clarify. MECHANICAL COMMENTS Sheet M-101 1. Show the ¾" condensate drain connection to the lavatory tail piece. Ref. UPC 807.2. 2. Please clarify the provisions for outdoor ventilation air. Ref. IMC 403.3. ELECTRICAL COMMENTS Sheet E-101 1. Coordinate with energy comment 1 2. Provide exit lighting designed to direct occupants to the exit at the reception area. Ref. IBC 1003.2.10. 3. Notes at stair are referenced to circuits shown as spares. Please clarify. 4. Recheck conductor size for 30 amp HWH-3. Ref. NEC 310. ENERGY COMMENTS General 1. Please provide the interior power lighting analysis. Ref. IECC Table 705.4. |
09/10/2003 | EROSE1 | WATER | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/10/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |