Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-COMMERCIAL
Permit Number - T03CM04147
Review Name: 3RD PARTY REVIEW-COMMERCIAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/15/2003 | EROSE1 | WWM | REVIEW | Needs Review | |
10/15/2003 | STANTEC | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | SCOPE OF REVIEW: The scope of this review covers Architectural, Structural, Plumbing, Mechanical and Electrical. All features were checked only to the extent allowed by the submittal provided. All portions of the project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. GENERAL: q There are no general comments to be addressed. ARCHITECTURAL: q There are no architectural comments to be addressed. STRUCTURAL: q There are 6 new packaged heat pumps weighing between 700 and 790 lbs. each and 2 new evaporative coolers that weigh 650 lbs. each. Are these new units replacing existing units in the same locations? If not, what is the structural impact of the additional weight to the building? Please clarify. This previous comment has been partially addressed. It is apparent that the primary trusses are adequate, however the notes on the original drawings for the shell indicate that double 2x6 purlins shall be placed under the mechanical units. The units being placed under this permit are not in the same location as the ones under the original shell drawings. It needs to be clear that additional framing is to be provided under these units and the units must be located between two primary framing trusses. MECHANICAL: q There are no mechanical comments to be addressed. PLUMBING: q There are no plumbing comments to be addressed. ELECTRICAL: q There are no electrical comments to be addressed. -End of Review- |
10/15/2003 | EROSE1 | WATER | REVIEW | Needs Review | |
10/15/2003 | EROSE1 | FIRE | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/15/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |