Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T03CM04130
Parcel: 10824012A

Address:
2498 E RIVER RD

Review Status: Completed

Review Details: 3RD PARTY REVIEW-COMMERCIAL

Permit Number - T03CM04130
Review Name: 3RD PARTY REVIEW-COMMERCIAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/11/2003 DHERRON1 WWM REVIEW Needs Review
09/11/2003 DHERRON1 ZONING REVIEW Needs Review
09/11/2003 WILDAN 3RD PARTY REVIEW-COMMERCIAL REVIEW Denied The initial review for the above project has been completed. This letter reflects comments which need to be addressed by a written response to each, indicating action taken. In order to facilitate a shorter back-check time, we request that you please provide two (2) sets revised plans and calculations, highlighting any changes with appropriate revision number, revision date and "cloud bubbles." Please return redline drawings with your resubmittal.


Occupancy
Occup. Load
Construction
Area S.F.
Sprinklered
Alarms

B
56
V-B
5600
Yes
Smoke


GENERAL COMMENTS:

1. This project has been reviewed for conformance with the 2000 IBC, 1997 UAC, 2000 IMC, 1998 IECC, 1999 NEC codes with local modifications, and the 1994 UPC with State of Arizona Amendments. Any revisions to this plan will require an additional review and approval by Willdan.


ARCHITECTURAL COMMENTS:

Sheets AL1, AL2, D1, and D2

1. The following is required to be stamped (where applicable) and wet-signed by the Arizona licensed or registered professional who prepared the document(s):
a. Sheets A1-1, A1-2, D1, D2 (Reference ARS-32-144)

Sheet A1

1. Exit doors shall be operable from the inside without the use of a key, special knowledge, or effort. In Group B, key-locking hardware may be used on the main exit if a sign is posted at door stating, "This door to remain unlocked when the building is occupied." Reference IBC Section 1003.3.1.8.

Sheet A1.1

1. Cross-reference all details and sections. Note #9 at the shower does not appear to apply. It appears note #44 should be applied. Reference IBC Section 106.1.1.

2. Cross-reference all details and sections. Please clarify note #9 in Room 128. It does not appear to apply to this location. Reference IBC Section 106.1.1.

Sheet A2

1. Cross-reference all details and sections. The reference to the roof drain detail, 6/A2, appears to be mislabeled. The correct reference should be 7/A2. Reference IBC Section 106.1.1.

2. Cross-reference all details and sections. Please locate AC unit #2 on the roof framing plan. Reference IBC Section 106.1.1.

Sheet A3

1. Cross-reference all details and sections. At building section #6, the detail reference 11/A4 appears to be mislabeled. The correct reference should be detail 10/A4. Reference IBC Section 106.1.1.

2. Cross-reference all details and sections. Please clarify the need for the application of note #7 to the glazing in the west elevation. Reference IBC Section 106.1.1.

3. Note on plans that bathroom accessories, such as grab bars, towel bars, soap dishes, etc., on or within walls shall be sealed against moisture. Reference IBC Section 1209.2.

4. Exits shall not pass through kitchens, storerooms, and rooms used for similar purposes. Please clarify the directional arrows on the exit sign at the break room. Reference IBC Section 1003.3.1.8.

5. When exit doors are used in pairs and approved automatic flush bolts are used, the door leaf with the automatic flush bolts shall have no doorknob or surface-mounted hardware. The unlatching of any leaf shall be done in one operation. Reference IBC Section 1003.3.1.8 #3.


STRUCTURAL COMMENTS:

Sheet S0.1

1. Special inspection pursuant to UBC Section 1701 is required as identified on the plans. The special inspector shall be approved by the Building Official prior to start of work. Please provide the completed Special Inspection Certificate. Reference IBC Chapter 17.

Sheet A3

1. There appears to be no structural details for the gravity support and lateral bracing of the suspended ceiling framing. Please clarify. Reference 2000 IBC Section 106.1.1.


PLUMBING COMMENTS:

Sheet A3

1. Design of rainwater piping shall be in accordance with UPC Appendix D, using a minimum rainfall intensity of three inches (101.6 mm) per hour. Please provide rainfall and roof drain calculations pursuant to UPC Appendix D.

Sheets A3 and P1.1

1. One drinking fountain is required. Fountains on accessible levels shall be handicapped accessible. Reference UPC Appendix C.


MECHANICAL COMMENTS:

1. Please clarify if this facility will be provided with medical gas. Provide all specifications and details. Reference IFC Section 3006.

Sheet A3

1. Provide a minimum of 10 separation between the outside air intake on AC units and the exhaust fans and dryer duct termination. Reference IMC Section 401.5.1.


ELECTRICAL COMMENTS:

Sheets E1-E4

1. The provisions of Article 517 (Health Care Facilities) shall be applied to the electrical systems serving the patient care areas. Please identify the applicable provisions and the effected circuits on the plan. Reference NEC Article 517.


ENERGY CODE COMMENTS:

The energy code portion has been reviewed and accepted.


ACCESSIBILITY COMMENTS:

Sheet A3

1. Grab bars, tub and shower seats, and their backing and attachment shall be designed for 250-pound (1112N) point load as specified in IBC Section 1607.7.2. Provide construction details.

2. Provide details and dimensions for the accessible shower to include inside dimensions of the unit, the curb, and the seat controls, including the handheld showerhead. Reference ADAAG Section 4.26.

Provide disabled accessible water fountain(s). Provide complete details and dimensions on the plans. Such fountain(s) shall comply with ADAAG Section 4.15.
09/11/2003 DHERRON1 WATER REVIEW Needs Review
09/11/2003 DHERRON1 ENGINEERING REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
09/11/2003 DHERRON1 OUT TO CUSTOMER Completed