Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T03CM04100
Review Name: COMMERCIAL NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/22/2003 | JIM EGAN | FIRE | REVIEW | Approved | |
| 08/22/2003 | ROBERT SHERRY | WATER | REVIEW | Passed | |
| 08/22/2003 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
| 08/22/2003 | RSCHULE1 | WWM | REVIEW | Passed | |
| 08/25/2003 | MARTIN HAEBERLE | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Provide a soils report for the retaining walls, control building, and storage tank areas. Reference section 1802.6 IBC 2. Site drainage flows over retaining wall slopes. How is slope stability to be maintained? 3. Indicate soils type to be used for backfill on lower retaining wall that would be conducive for the proposed drainage system. 4. The control building, 5,000-gallon storage tank, and power transformer are in close proximity to the upper level retaining wall. Retaining wall calculations do not address these loads. Please clarify. 5. Structural engineer to seal plans for proposed retaining walls. 6. Special Inspection required for site preparation, masonry, concrete, welding, and foundation excavation. Indicate on plans 7. Lower wall is being partially constructed on the adjacent property. Revise plans |
| 08/28/2003 | Linda Buczynski | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 09/02/2003 | CRAIG GROSS | ZONING | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/04/2003 | LISA LESNY | OUT TO CUSTOMER | Completed |