Permit Number: T03CM04027
Parcel: 135102890

Address:
7411 E 32ND ST

Review Status: Completed

Review Details: 3RD PARTY REVIEW-RESIDENTIAL

Permit Number - T03CM04027
Review Name: 3RD PARTY REVIEW-RESIDENTIAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/11/2003 DHERRON1 WWM REVIEW Needs Review
11/11/2003 WILDAN 3RD PARTY REVIEW-COMMERCIAL REVIEW Denied The second review of the above-referenced project has been completed. The following items reflect original comments that remain unaddressed and require a written response indicating any action to be taken. In order to facilitate a shorter back-check time, we request that you provide two (2) sets revised plans and calculations, which highlight any changes made to the previous submittal. Please replace all revised drawing sheets, in all sets of plans, before returning to Willdan for the follow-up plan review. Please return comment drawings with your resubmittal.

Also, please note that per paragraph V-C third party contract, third and subsequent reviews will be charged at the current hourly rate in addition to the base contract amount.


Occupancy
Occup. Load
Construction
Area S.F.
Sprinklered
Alarms

R-3 (New)
R-3 (Remodel)
U
N/A
N/A
N/A
V-B
V-B
V-B
691
1,334
346
No
No
No
Smoke
Smoke
No


GENERAL COMMENTS:

1. This project has been reviewed for conformance with the 2000 IRC, 1997 UAC as adopted by the City of Tucson, and the 1994 UPC with State of Arizona amendments. Any revisions to this plan will require an additional review and approval by Willdan.

2. The comments below reflect previous comments that remain unresolved.


ARCHITECTURAL COMMENTS:

Sheet T.1

1. The new gas line is not shown on the site plan. Review and clarify. Reference R106.1.1.

Sheet D1.1

1. The response letter identifies the existing wood framed gabled roof as having a ridge beam. However, the drawing does not show the wood beam, or its size, span, or end supports. Review and clarify existing roof supports. Reference R106.1.1 and R802.

Sheets A1.1, A2.1, A3.1

1. Provide a definitive dimension from the existing property line to the new roof edge and to the face of new west building wall. Comply with all requirements for residence building wall nest to a property line. The exception for a shed does not apply since all of the roofs are connected together. No part of the building or footing shall extend over the lot line. Review and clarify. Reference R302.

Sheet A5.1

1. The new roof slope is noted to be both ΒΌ inch per foot and 3/8 inch per foot minimum. Review and coordinate. Reference IBC Section 106.1.1.


STRUCTURAL COMMENTS:

Sheet S1.1

1. The footing under the western part of the building is not sized. Footing width shall not be less than that required by Table R403.1. Review and clarify. Reference R403.1.

2. It is proposed that the existing patio wall foundation be used to support the new west CMU building wall. Patio walls are often constructed as "fences" not requiring permits. However, building walls require permits. The existing wall foundation shall be shown to be in compliance with the requirements as a building foundation, or it shall be removed and a new foundation constructed to code requirements. Reference R105.2, R106.4, R110.1, and R403.

Sheet S2.1

1. Section 2 no longer applies at the new ridge. Detail 9 now shows that the ridge is offset from the bearing wall and the plan shall reflect that. Review and coordinate. Reference R106.1.1.

2. Clarify the support conditions and member sizes for the existing roof construction above the wall that is being removed. Reference R106.1.1.

Sheet S3.1

1. Clarify the material and installation specification for brick masonry and CMU masonry. Reference R106.1.1.

PLUMBING COMMENTS:

Sheet S2.1

1. The size and gage of metal gutter and downspout is not shown. Review and clarify. Reference UPC Appendix D.


MECHANICAL COMMENTS:

Sheet M1

1. The 110,000 BTUH gas furnace requires two combustion air ducts. One high and one low, with each not less than 60 square inches. The designated "new 12"x8" combination relief high/low duct is not understood. Review and clarify. Reference UPC 507.


ELECTRICAL COMMENTS:

The electrical portion was reviewed and accepted.


ENERGY CODE COMMENTS:

The energy code portion was reviewed and accepted.


ACCESSIBILITY COMMENTS:

The accessibility portion was reviewed and accepted.

Final Status

Task End Date Reviewer's Name Type of Review Description
11/11/2003 DHERRON1 OUT TO CUSTOMER Completed