Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-RESIDENTIAL
Permit Number - T03CM04027
Review Name: 3RD PARTY REVIEW-RESIDENTIAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/23/2003 | MVALDEZ1 | WWM | REVIEW | Needs Review | |
| 10/23/2003 | WILDAN | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | The initial review for the above project has been completed. This letter reflects comments which need to be addressed by a written response to each, indicating action taken. In order to facilitate a shorter back-check time, we request that you please provide two (2) sets revised plans and calculations, highlighting any changes with appropriate revision number, revision date and "cloud bubbles." Please return redline drawings with your resubmittal. Occupancy Occup. Load Construction Area S.F. Sprinklered Alarms R-3 (New) R-3 (Remodel) U N/A N/A N/A V-B V-B V-B 691 1,334 346 No No No Smoke Smoke No GENERAL COMMENTS: 1. This project has been reviewed for conformance with the 2000 IRC, the 1997 UAC with local modifications, and the 1994 UPC with State of Arizona Amendments. Any revisions to this plan will require an additional review and approval by Willdan. 2. Please coordinate that all required building code notes are in accordance with 2000 IRC and not the former UBC or other codes. ARCHITECTURAL COMMENTS: Sheet T.1 1. Discipline drawings call for new gas line to the existing meter in alley, a new water line to a new water meter and a new underground electrical service. Review and coordinate site plan with discipline drawings. Reference R106.1.1 and R111. 2. Identify on the drawing the applicable codes for design and construction. Reference R106.1.1. 3. Please identify Occupancy Classification as R-3, and Building Construction as V-B. Sheet D1.1 1. The existing property line wall is not shown as a demolition item. However, keynote #21 on sheet A1.1 calls for a new patio wall line segment to support as portion of the new construction. Review and coordinate. Reference R106.1.1. 2. The existing wood framed gabled roof appears to have rafters with a central support under the ridge. However, the existing central wall is noted as an existing non-bearing wall and noted to be removed. Review and clarify existing structural roof construction and support points. Reference R106.1.1 and AJ102. Sheet A1 1. An existing bedroom is relabeled as an office. However, the room after the remodel does not have a window. Habitable rooms required ventilation, and as a room that is still useable as a bedroom, it shall have an emergency escape window and smoke detector. Review and clarify. Reference R303, R310, R317, and AJ501.6. 2. Identify the location of the property line on the plan. Reference R302.1. 3. Label "new" service entrance. Reference R106.1.1. Sheet A1.2 1. Provide overall dimensions for the existing building. Reference R106.1.1. Sheet A2.1 1. Emergency escape windowsills shall not be greater than 44 inches above the floor. Review and clarify. Reference R310.1. 2. Building elevations are not coordinated with the plans. Review and coordinate. Reference R106.1.1. 3. Identify roof slopes. Reference R905 4. The proposed new roof construction shows that roof storm water will be deposited over the property line onto the neighbor's property. This situation shall be mitigated by installing a gutter on the roof edge that does not extend over the property line. A gutter leader shall deposit the storm water at least 5 feet from wall and building foundations on grade that drains away from foundations. Reference R302, R401.3, and R801.3. 5. It is appears that some portion of an existing patio line wall is being proposed to be extended upward to serve as the exterior building wall. Patio walls are often construction as "fences" not requiring permits. However, building walls require permits. The existing wall and foundation shall be shown to be in compliance with the requirements as a building foundation and wall, or it shall be removed and a new foundation and wall constructed to code requirements. Reference R105.2, R106.4, and R110.1. Sheet A3.1 1. Provide definitive dimension from the existing property line to the new roof fascia and to edge of footing supporting new CMU wall, and comply with all requirements for residence building wall next to a property line. The exception for a shed does not apply since all of the roofs are connected together. Reference R302. STRUCTURAL COMMENTS: Sheet S1.1 1. Structural wood posts exposed to weathering shall be pressure treated and elevated above the floor level by at least 1-inch. Reference R323.1.3 and R323.1.4. 2. Treated building wall sills shall be anchored with ½-diameter anchor bolts with minimum 7-inch embedment into the foundation. Reference R403.1.6. 3. Foundations supporting wood framed walls shall be not less than 6 inches above finished grade. Reference R404.1.6. 4. The proposed masonry veneer details shall be enhanced to show and specify masonry weight and thickness, anchorage to framed walls, air space, mortar, flashing, weep holes, and other requirements. Reference R 703.7. 5. Coordinate size and location of all new footings with building design requirements. Reference R403.1. 6. Proposed use of epoxy anchors shall identify a qualified anchor for use under the 2000 IRC. Calculations shall be submitted to verify proposed use. Reference R104.11. Sheet S2.1 1. Coordinate structural requirements with comment #2 for Sheet D1.1. 2. Framing detail 2 does not match the ridge condition. Review and coordinate. Reference R106.1.1. Sheet S3.1 1. In lieu of a complete geotechnical evaluation, the foundation soil bearing value is assumed to be 1,500 pfs for soil types listed in Table R401.4.1. Footings shall be noted for support on undisturbed natural soils and not less than 1-foot below undisturbed ground. One foot below undisturbed ground does not mean one foot below finished or existing grade. Reference R401.4.1, R403.1, and R403.1.4. 2. Surface drainage shall be diverted to an approved point of collection. Lots shall be graded to drain surface water away from the foundation. The grade away from foundation walls shall be noted to fall a minimum of 6 inches within the first 10 feet. Reference R401.3. 3. All references to geotechnical engineering practices and structural engineer shall be deleted, unless that work is under the sealed design supervision of a qualified civil/structural engineer licensed in Arizona. Engineered fills supporting foundations requires special inspections and soil tests. Review and clarify. Reference R401.2 and R401.4. 4. No structural steel is evident in the proposed work. Delete structural steel notes. Reference R106.1.1. 5. Masonry construction is called for, but no masonry construction notes are identified on the drawing. Provide masonry construction specifications. Reference R606. 6. Correct plywood and OSB designation to that required by IRC. Reference R803.2 and R503.2. 7. Identify wood framed construction nailing to be in accordance with IRC Table R302.3(1). 8. Compacted fill depth below a non-structural residence floor slab on grade shall not exceed 24 inches except when designed and approved by a qualified soils engineer. Review and clarify. Reference R506.2.1. 9. CMU shall be specified to comply ASTM C90 and identified as either having a normal weight, medium weight, or lightweight. Reference R606 and ACI 530. PLUMBING COMMENTS: Sheet P1 1. Coordinate the design of the new gas piping and meter with the existing gas demand and new gas demand. Reference UPC Section 1217. 2. The plumbing fixture unit schedule shall be coordinated with UPC Table 6-3 and Table 7-3. 3. Plumbing shall be noted for compliance with 1994 UPC with State of Arizona amendments. MECHANICAL COMMENTS: 1. Code reference shall be for compliance with 2000 IRC with City of Tucson amendments. 2. Provide a plan detail showing the required clearances around central furnaces for access, maintenance, repair, and clearance from combustible materials. Reference M1305 and M1306. 3. Combustion air for gas furnaces shall all be obtained from the exterior in accordance with UPC Section 507.2. Review and show required duct sizes and plan orientation for high-low ducts. 4. Condensate disposal is not shown. Review and show required piping and disposal. Reference M1411.3 and UPC Section 807.1. ELECTRICAL COMMENTS: 1. The support of ceiling paddle fans shall be shown to comply with IRC E4001.6. 2. Identify smoke detector in the existing bedroom. Reference R317. 3. Provide switch operated ceiling light in the water heater and furnace compartment. Reference E3803.4. 4. Provide catalog cut for outdoor fixtures and lamps to show compliance with City of Tucson Outdoor Lighting Code, Table 5. ENERGY CODE COMMENTS: Sheet A1.1 1. The building official has identified Tucson with HDD = 2100. Accordingly, replacement glazing for an existing residence shall have a U < 0.5 with a SHCG £ 0.4. Reference N1102.4 and AJ102.4. ACCESSIBILITY COMMENTS: 1. The accessibility portion has been reviewed and accepted. |
| 10/23/2003 | WILDAN | 3RD PARTY REVIEW-COMMERCIAL | AT 3RD PARTY OFFICE | Completed | The initial review for the above project has been completed. This letter reflects comments which need to be addressed by a written response to each, indicating action taken. In order to facilitate a shorter back-check time, we request that you please provide two (2) sets revised plans and calculations, highlighting any changes with appropriate revision number, revision date and "cloud bubbles." Please return redline drawings with your resubmittal. Occupancy Occup. Load Construction Area S.F. Sprinklered Alarms R-3 (New) R-3 (Remodel) U N/A N/A N/A V-B V-B V-B 691 1,334 346 No No No Smoke Smoke No GENERAL COMMENTS: 1. This project has been reviewed for conformance with the 2000 IRC, the 1997 UAC with local modifications, and the 1994 UPC with State of Arizona Amendments. Any revisions to this plan will require an additional review and approval by Willdan. 2. Please coordinate that all required building code notes are in accordance with 2000 IRC and not the former UBC or other codes. ARCHITECTURAL COMMENTS: Sheet T.1 1. Discipline drawings call for new gas line to the existing meter in alley, a new water line to a new water meter and a new underground electrical service. Review and coordinate site plan with discipline drawings. Reference R106.1.1 and R111. 2. Identify on the drawing the applicable codes for design and construction. Reference R106.1.1. 3. Please identify Occupancy Classification as R-3, and Building Construction as V-B. Sheet D1.1 1. The existing property line wall is not shown as a demolition item. However, keynote #21 on sheet A1.1 calls for a new patio wall line segment to support as portion of the new construction. Review and coordinate. Reference R106.1.1. 2. The existing wood framed gabled roof appears to have rafters with a central support under the ridge. However, the existing central wall is noted as an existing non-bearing wall and noted to be removed. Review and clarify existing structural roof construction and support points. Reference R106.1.1 and AJ102. Sheet A1 1. An existing bedroom is relabeled as an office. However, the room after the remodel does not have a window. Habitable rooms required ventilation, and as a room that is still useable as a bedroom, it shall have an emergency escape window and smoke detector. Review and clarify. Reference R303, R310, R317, and AJ501.6. 2. Identify the location of the property line on the plan. Reference R302.1. 3. Label "new" service entrance. Reference R106.1.1. Sheet A1.2 1. Provide overall dimensions for the existing building. Reference R106.1.1. Sheet A2.1 1. Emergency escape windowsills shall not be greater than 44 inches above the floor. Review and clarify. Reference R310.1. 2. Building elevations are not coordinated with the plans. Review and coordinate. Reference R106.1.1. 3. Identify roof slopes. Reference R905 4. The proposed new roof construction shows that roof storm water will be deposited over the property line onto the neighbor's property. This situation shall be mitigated by installing a gutter on the roof edge that does not extend over the property line. A gutter leader shall deposit the storm water at least 5 feet from wall and building foundations on grade that drains away from foundations. Reference R302, R401.3, and R801.3. 5. It is appears that some portion of an existing patio line wall is being proposed to be extended upward to serve as the exterior building wall. Patio walls are often construction as "fences" not requiring permits. However, building walls require permits. The existing wall and foundation shall be shown to be in compliance with the requirements as a building foundation and wall, or it shall be removed and a new foundation and wall constructed to code requirements. Reference R105.2, R106.4, and R110.1. Sheet A3.1 1. Provide definitive dimension from the existing property line to the new roof fascia and to edge of footing supporting new CMU wall, and comply with all requirements for residence building wall next to a property line. The exception for a shed does not apply since all of the roofs are connected together. Reference R302. STRUCTURAL COMMENTS: Sheet S1.1 1. Structural wood posts exposed to weathering shall be pressure treated and elevated above the floor level by at least 1-inch. Reference R323.1.3 and R323.1.4. 2. Treated building wall sills shall be anchored with ½-diameter anchor bolts with minimum 7-inch embedment into the foundation. Reference R403.1.6. 3. Foundations supporting wood framed walls shall be not less than 6 inches above finished grade. Reference R404.1.6. 4. The proposed masonry veneer details shall be enhanced to show and specify masonry weight and thickness, anchorage to framed walls, air space, mortar, flashing, weep holes, and other requirements. Reference R 703.7. 5. Coordinate size and location of all new footings with building design requirements. Reference R403.1. 6. Proposed use of epoxy anchors shall identify a qualified anchor for use under the 2000 IRC. Calculations shall be submitted to verify proposed use. Reference R104.11. Sheet S2.1 1. Coordinate structural requirements with comment #2 for Sheet D1.1. 2. Framing detail 2 does not match the ridge condition. Review and coordinate. Reference R106.1.1. Sheet S3.1 1. In lieu of a complete geotechnical evaluation, the foundation soil bearing value is assumed to be 1,500 pfs for soil types listed in Table R401.4.1. Footings shall be noted for support on undisturbed natural soils and not less than 1-foot below undisturbed ground. One foot below undisturbed ground does not mean one foot below finished or existing grade. Reference R401.4.1, R403.1, and R403.1.4. 2. Surface drainage shall be diverted to an approved point of collection. Lots shall be graded to drain surface water away from the foundation. The grade away from foundation walls shall be noted to fall a minimum of 6 inches within the first 10 feet. Reference R401.3. 3. All references to geotechnical engineering practices and structural engineer shall be deleted, unless that work is under the sealed design supervision of a qualified civil/structural engineer licensed in Arizona. Engineered fills supporting foundations requires special inspections and soil tests. Review and clarify. Reference R401.2 and R401.4. 4. No structural steel is evident in the proposed work. Delete structural steel notes. Reference R106.1.1. 5. Masonry construction is called for, but no masonry construction notes are identified on the drawing. Provide masonry construction specifications. Reference R606. 6. Correct plywood and OSB designation to that required by IRC. Reference R803.2 and R503.2. 7. Identify wood framed construction nailing to be in accordance with IRC Table R302.3(1). 8. Compacted fill depth below a non-structural residence floor slab on grade shall not exceed 24 inches except when designed and approved by a qualified soils engineer. Review and clarify. Reference R506.2.1. 9. CMU shall be specified to comply ASTM C90 and identified as either having a normal weight, medium weight, or lightweight. Reference R606 and ACI 530. PLUMBING COMMENTS: Sheet P1 1. Coordinate the design of the new gas piping and meter with the existing gas demand and new gas demand. Reference UPC Section 1217. 2. The plumbing fixture unit schedule shall be coordinated with UPC Table 6-3 and Table 7-3. 3. Plumbing shall be noted for compliance with 1994 UPC with State of Arizona amendments. MECHANICAL COMMENTS: 1. Code reference shall be for compliance with 2000 IRC with City of Tucson amendments. 2. Provide a plan detail showing the required clearances around central furnaces for access, maintenance, repair, and clearance from combustible materials. Reference M1305 and M1306. 3. Combustion air for gas furnaces shall all be obtained from the exterior in accordance with UPC Section 507.2. Review and show required duct sizes and plan orientation for high-low ducts. 4. Condensate disposal is not shown. Review and show required piping and disposal. Reference M1411.3 and UPC Section 807.1. ELECTRICAL COMMENTS: 1. The support of ceiling paddle fans shall be shown to comply with IRC E4001.6. 2. Identify smoke detector in the existing bedroom. Reference R317. 3. Provide switch operated ceiling light in the water heater and furnace compartment. Reference E3803.4. 4. Provide catalog cut for outdoor fixtures and lamps to show compliance with City of Tucson Outdoor Lighting Code, Table 5. ENERGY CODE COMMENTS: Sheet A1.1 1. The building official has identified Tucson with HDD = 2100. Accordingly, replacement glazing for an existing residence shall have a U < 0.5 with a SHCG £ 0.4. Reference N1102.4 and AJ102.4. ACCESSIBILITY COMMENTS: 1. The accessibility portion has been reviewed and accepted. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/23/2003 | MONICA VALDEZ | OUT TO CUSTOMER | Completed |