Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-REVISION/OTHER
Permit Number - T03CM03990
Review Name: 3RD PARTY REVIEW-REVISION/OTHER
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/28/2003 | WILDAN | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | ARCHITECTURAL COMMENTS General 1. The minimum font size is 12 point. Increase font sizes throughout the plan set. Sheet 2 1. Revise keynotes 3 and 15 to specify the non absorbent surface to a height of 6' above the floor. Ref. R307.2. 2. Keynote 5 specifies soffits at 7'. This is not shown on the plan. Clarify. 3. Keynote 6 is not shown on the plan. Clarify. 4. Keynote 7 is not shown on the plan. 5. Keynotes 8 and 9 apply to garage construction. Delete. 6. Show where keynotes 10 through 14 occur on the plan. 7. Keynote 16 is for a fireplace. No fireplace is shown on the plan. Clarify or delete. 8. The 3040 window at the stair landing requires safety glazing. Ref. R308.4.9. 9. Show under stair protection. A minimum of ½" GWB is required. Ref. R314.8. 10. Complete construction dimensions. Sheet 3 1. Correct the numbering in the footing schedule and specify the steel reinforcement to be used. 2. Provide a turn down detail for the porch foundation. See redlines. Sheet 4 1. Specify headers that comply with Table R-502.5(2). 2. Specify the roof sheathing to be used. Three different types are specified. 3. Roof tile is specified in the notes. No roof tile was found on the plan. Please clarify. 4. Show the openings and headers on the roof framing plan. 5. Detail the GLB to wall connection and complete the load path. 6. Horizontal roof framing must account for the concentrated load of the mechanical equipment. Sheet 5 1. Provide a complete stair design. Ref. R314 PLUMBING COMMENTS Sheet 3 1. Revise the fixture schedule for quantities, totals and waste line sizes. Ref. UPC Table 7. 2. Show the cleanout for the first floor powder room. Ref. UPC 707.4. 3. Provide a pressure and temperature relief valve and route the drain to an approved point of disposal. Ref. UPC 608. 4. Provide a fullway valve between the meter and the supply line. Ref. UPC 605. 5. The 1" gas line to the 60,000 BTU furnace is oversized. Please Revise. Ref. UPC 1217. MECHANICAL COMMENTS Sheet 7 1. Provide the specifications for the 3.5 ton gas pack. 2. Provide a specification for the exhaust fans and show them on the plan. Ref. R303.3. 3. Recheck the CFM value for the rec. room. ELECTRICAL COMMENTS Sheet 6 1. Clarify power for the water heater. Show this on the plan and on the panel schedule. 2. An additional convenience receptacle is required in the living room. Ref. E3801.2. Please see redlines. 3. Remove the outlet from the interior of the mechanical chase. 4. Show the WP GFI rooftop receptacle for the mechanical equipment. 5. The electrical riser diagram and load calculation specify a 125 amp service. The panel schedule shows a 100 amp main. Please revise the panel schedule. 6. Circuit 10, for the furnace was not found on the plan. Please show this. 7. Revise the closet light note to reference IRC, E3903.11. ENERGY COMMENTS General 1. Indicate the seasonal energy efficiency rating of the mechanical unit. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/28/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |