Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T03CM03933
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/08/2003 | JIM EGAN | FIRE | REVIEW | Approved | |
08/08/2003 | MARTIN HAEBERLE | BUILDING-COMMERCIAL | REVIEW | Approved | |
08/08/2003 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
08/08/2003 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved | 8/8/03 1. Instantaneous water heater is 120V on Sheet MP.1 and 240V on E.1. Please clarify. 2. Please clarify amperage on heat pumps. HP-1 5 ton, HP-2 4 ton. There is only 3 amps difference between the two on the electrical load calculation. 3. Show protection for conductors feeding New Panel A. 4. Show method of connection of conductors from disconnect to Service A to new disconnect for HP-1. 5. Specify conduit size and type, and conductor size and type, for all such new equipment of Line Diagrams. 6. Specify protection for conductors from service disconnect for Service A to HP-1 disconnect. 7. Provide available fault current from TEP on plans, and fault calculations as necessary to demonstrate that rating of panels is sufficient. 8. Load calculation for Service B shall include that for existing tenant. 9. Circuits B-3 and B-5 each contain 4 receptacles. Correct to 180 VA per receptacle. |
08/08/2003 | PATRICIA GILBERT | ENGINEERING | REVIEW | Approved | |
08/13/2003 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
08/13/2003 | ROBERT SHERRY | WATER | REVIEW | Approved | |
08/13/2003 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
08/14/2003 | GERRY KOZIOL | WWM | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/14/2003 | TAMI ACHONG | OUT TO CUSTOMER | Completed |