Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-COMMERCIAL
Permit Number - T03CM03878
Review Name: 3RD PARTY REVIEW-COMMERCIAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/18/2003 | TACHONG1 | WWM | REVIEW | Needs Review | |
09/18/2003 | TACHONG1 | ZONING | REVIEW | Needs Review | |
09/18/2003 | WILDAN | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | The second review of the above-referenced project has been completed. The following items reflect original comments which remain unaddressed and require a written response indicating any action to be taken. In order to facilitate a shorter back-check time, we request that you provide two (2) sets revised plans and calculations, which highlight any changes made to the previous submittal. Please return comment drawings with your resubmittal. Also, please note that per paragraph V-C third party contract, third and subsequent reviews will be charged at the current hourly rate in addition to the base contract amount. Occupancy Occup. Load Construction Area S.F. Sprinklered Alarms A-3 534 III-B 40,013 Yes Yes GENERAL COMMENTS: 1. This project has been reviewed for conformance with the 2000 IBC, 1997 UAC, 2000 IMC, 1998 IECC, 1999 NEC codes with local modifications, and the 1994 UPC with State of Arizona amendments. Any revisions to this plan will require an additional review and approval by Willdan. ARCHITECTURAL COMMENTS: 1. Sheets A0.0 through A0.9 (Site Plans and Details) are marked: For Reference Only. Drawings to be used for commercial permit work must be released for construction. Please correct. Reference IBC Section 106. 2. Sheets ID-1.0 through ID-10.1 are marked: Preliminary Not For Construction, and the drawings are not sealed. Drawings to be used for commercial permit work must be released for construction and sealed by the responsible registrant. Please correct. Reference IBC Section 106. STRUCTURAL COMMENTS: 1. The City of Tucson required Special Inspection and Testing Agreement has not been provided with the submittal documents. A copy is provided for your convenience. Please complete and submit two copies of the completed agreement. Reference IBC Section 106. 2. The structural design is not completed. A deferred submittal will be required for the completion of the structural design work. Sealed submittal drawings and sealed structural calculations for the deferred structural design items shall be submitted to the registered design professional in responsible charge who shall review them and forward them to Willdan with a notation indicating that the deferred design submittal documents have been reviewed and that they have been found to be in general conformance with the design of the building. A set of the approved permitted drawing package will be required with the deferred design document submittal. The deferred design items shall not be installed until their design and submittal documents have been approved by Willdan and subsequently issued approved under the permit by the City of Tucson. Willdan will review deferred design submittals on an hourly fee basis. Reference IBC Section 106.3.4.2. PLUMBING COMMENTS: The plumbing portion has been reviewed and accepted. MECHANICAL COMMENTS: The mechanical portion has been reviewed and accepted. ELECTRICAL COMMENTS: 1. Sheets E0.1 through E0.3 and Sheet ES1.0 are marked: For Reference Only. Drawings to be used for commercial permit work must be released for construction. Please correct. Reference IBC Section 106. ENERGY CODE COMMENTS: The energy code portion has been reviewed and accepted. ACCESSIBILITY COMMENTS: 1. Sheet A15.0, showing accessible details, is marked: For Reference Only. Drawings to be used for commercial permit work must be released for construction. Please correct. Reference IBC Section 106. |
09/18/2003 | TACHONG1 | WATER | REVIEW | Needs Review | |
09/18/2003 | TACHONG1 | ENGINEERING | REVIEW | Needs Review |