Permit Review Detail
Review Status: Completed
Review Details: REVISION
Permit Number - T03CM03808
Review Name: REVISION
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/27/2004 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T03CM03808 DENIED 2/27/04 1. Show conductor sizes for new mechanical equipment. 2. It appears that the Tenant B lighting on Circuit 11 is actually meant for Circuit A-10. Please clarify. 3. The way the new meter, disconnect, and panel are shown on the Riser diagram, there is no connection to the grounding electrode system. Establish such connection. See NEC 250-24. 4. Grounding conductor on the line side of the N-G bond, if present, shall be sized per Table 250-66. However, it would be desirable to remove the #6 on the line side of such bond as a redundant path to ground. |