Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T03CM03551
Parcel: 115062140

Review Status: Completed

Review Details: 3RD PARTY REVIEW-COMMERCIAL TI

Permit Number - T03CM03551
Review Name: 3RD PARTY REVIEW-COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/31/2003 GP 3RD PARTY REVIEW-COMMERCIAL REVIEW Denied ARCHITECTURAL COMMENTS
General
1. Please be aware that County Health review and approval is required for approval to construct. Contact 740-2760 for information.

Sheet A-1
1. The coffee shop and the exercise room appear to be separate spaces. Please clarify if both spaces are to be considered space #1101 and permitted with the activity number T03CM03551.

2. The detail of the 2 hour wall (2/A-1) is not consistent with the prescriptive assembly of the UL design U443. Detail 2/A-1 appears to more closely approximate the Gypsum Association 2 hour assembly WP 1521. Please clarify.


3. Only a portion of the 1,908 s.f. is assembly area. Please recalculate the occupant load taking fixed seating or table and chair seating in the "dining area" into consideration. The commercial kitchen potion of the space would be calculated at 200 s.f. per occupant. Ref. IBC 1003.2.2.2.


STRUCTURAL COMMENTS - The structural portion has been reviewed and approved.


PLUMBING COMMENTS
Sheet P-1
1. Paper dispenser mounting criteria for distance in front of a water closet is 7" minimum and 9" maximum. Ref. ANSI A117.1, 604.7.

2. Please note that the drinking fountain will be installed with the manufacturers skirting so as not to create a protruding object. Ref. ANSI A1121, 307.


MECHANICAL COMMENTS
Sheet M-1
1. Please show required outside air for compliance with IMC 403.3.

2. Provide mechanical exhaust capacity for toilet rooms. Ref. IMC Table 403.3.

3. No return air provisions have been shown. Please clarify.


ELECTRICAL COMMENTS
Sheet E-1
1. Provide a one-line electrical service and riser diagram.

2. Please show junction boxes, home runs to panel and circuit lines indicating neutrals and conductors.

3. All receptacles appear to be switch operated. Please clarify.

4. Provide the interior lighting power analysis in coordination with energy comment 1.


ENERGY COMMENTS
General
1. Provide the interior lighting power analysis. Ref. IECC Table 705.4.
08/04/2003 EROSE1 ENGINEERING REVIEW Needs Review
08/04/2003 EROSE1 WWM REVIEW Needs Review
08/04/2003 ELAINE ROSE ZONING REVIEW Needs Review
08/04/2003 EROSE1 FIRE REVIEW Needs Review
08/04/2003 EROSE1 WATER REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
07/31/2003 ELAINE ROSE OUT TO CUSTOMER Completed