Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T03CM03499
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/02/2004 | Robert Sherry | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide calculations showing water supply piping is sized in accordance with Section 610.4, UPC 1994. 2. Include all existing fixtures being served by the same water meter in the water calculations. Reference Section 610.1, UPC 1994. 3. Calculate the water demand using the public use fixture units shown in Tables 6-3 or A-2. Reference Section 610.3, UPC 1994. 4. Provide cut sheets for the plumbing fixtures to show the listing information. Reference Section 401.1, UPC 1994. 5. Provide water supply isometrics. Reference Section 103.2.3, UPC 1994. 6. Provide the minimum plumbing facilities required by Table 2902.1, IBC 2000, for nightclub occupancy. 7. Provide a schedule of waste fixture units for all plumbing fixtures using the values shown in table 7-3, UPC 1994. 8. Include fixture P-5 (hand sink) on the waste riser diagram. Reference Section 103.2.3, UPC 1994. 9. Provide upper terminal cleanouts for P-1H, P-4, and P-5. Reference Section 707.4, UPC 1994. 10. Clarify purpose of pipe located along north side of new covered patio that is to be buried. |
04/02/2004 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
04/02/2004 | ROBERT SHERRY | WATER | REVIEW | Approved | |
04/15/2004 | Raul Palma | BUILDING-COMMERCIAL | REVIEW | Denied | City of Tucson, Development Services BUILDING AND STRUCTURAL COMMENTS 1) Provide two means of egress from the open patio and covered patio. Exit Doors shell swing in the direction of exit. 2) Provide floor elevations for the open, open patio, and covered patio,and outside of building perimeter. 3) Show the sitting lay-out for the new patios and also of the existing building. 4) The maximum door width of exit doors is 48". 5) Identify location of any stairs anywhere in bldg. 6) Provide EMERGENCY POWER for egress illumination as per section 1003.2.11.2. 7) Show all exit signs in floor plan. 8) Provide a push-bar on exit doors. |
04/16/2004 | GERRY KOZIOL | WWM | REVIEW | Approved | |
04/21/2004 | Linda Buczynski | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT LBUCZYN1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. 1. Provide power requirements for ceiling fan. 2. Provide power requirements for lighting fixtures to be installed on Circuit A-39. 3. Provide pole and foundation detail for the lighting pole. If such pole exceeds 20' in height, provide pole and foundation structural calculations, sealed by a Structural Engineer registered in the State of Arizona. 4. For the lighting fixtures to be installed on the existing circuit, provide panel and circuit numbers. 5. For the panel load calculations, please clarify which circuits are already counted with the 125% demand factor. A note at the bottom of the panel schedule provides a "*" reference for such, but this is not applied to any of the circuits. Review calculations as necessary. 6. Provide fixture cut sheets for new lighting fixtures. Verify compliance with the Outdoor Lighting Ordinance. |
04/29/2004 | PETER MCLAUGHLIN | ZONING | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/03/2004 | TAMI ACHONG | OUT TO CUSTOMER | Completed |
05/03/2004 | TAMI ACHONG | REJECT SHELF | Completed |